Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/19/2010 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 08/10/2010 | STORMWATER FOLLOW-UP INSP | Approved | SITE IS APPROXIMATELY 90% STABILIZED, TEMP SEDIMENT CONTROLS HAVE BEEN REMOVED | |
| 07/16/2010 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
| 06/07/2010 | STORMWATER FOLLOW-UP INSP | Continued | 1) ELIMINATED ONE ACCESS WAY FROM ROW TO BLDG. TO INCLUDE SIDEWALKS AND HC RAMPS (NEED REVISED PLAN). 2) CHANGE FROM VERTICAL CURB TO EXTRUDED CURB ALONG EAST AND NE SIDE PARKING AREA. 3) PROVIDE A REVISED PLAN SHOWING ALL CHANGES MADE FROM THE ORIGINAL APPROVED PLAN, PRIOR TO FINAL GRADING APPROVAL. 4) PROVIDE ENGINEERING CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD STATING THAT THE STORM DRAINAGE SYSTEM AND RET/DET BASINS WERE COMPLETED PER THE APPROVED GRADING PLAN. 5) ENSURE STORM WATER MAINT INSPECTIONS ARE PERFORMED AND DOCUMENTED. 6) REMOVE TEMP SEDIMENT CONTROLS IN AREAS WHERE CURBING IS IN PLACE. |
|
| 05/25/2010 | STORMWATER FOLLOW-UP INSP | Continued | 1) CAN REMOVE STORM WATER CONTROLS (SILT SOCK) ALONG SPEEDWAY. 2) HAVE QUESTIONS ABOUT ROOF DRAINAGE FROM ADJACENT PROPERTY ALONG EAST SIDE OF SITE. 3) ENSURE SPOILS FROM FOOTINGS OF PERIMETER WALLS REMAIN ON SITE. CALL FOR ANY QUESTIONS OR CONCERNS. ( MIKE JOHNSON - CHESNUT 733-3300) |
|
| 04/07/2010 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. NO SITE WORK AT THIS TIME, HOWEVER BASINS HAVE BEEN ROUGHED IN AND AN OUTLET STRUCTURE HAS BEEN COMPLETED. NO OTHER SITE WIRK IS BEING DONE. |
|
| 03/10/2010 | STORMWATER FOLLOW-UP INSP | Continued | NO STORM WATER CONCERNS | |
| 03/02/2010 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. SWEEP UP TRACKING OFF OF SURROUNDING ROADWAYS. NO CHANGES TO SITE WORK. |
|
| 01/28/2010 | STORMWATER FOLLOW-UP INSP | Continued | CONTRACTORS ERECTING STEEL BLDG, NO SITE WORK COMPLETED EXCEPT FOR A SMALL BASIN ROUGHED IN. NO STORM WATER CONCERNS AT THIS TIME |
|
| 01/12/2010 | STORMWATER FOLLOW-UP INSP | Continued | NO CHANGES AND/OR CONCERNS ON SITE. NO STORM WATER ISSUES AT THIS TIME | |
| 12/23/2009 | STORMWATER FOLLOW-UP INSP | Continued | STORM WATER ITEMS LISTED UNDER THE PREVIOUS INSPECTION HAVE BEEN ADDRESSED - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
| 12/08/2009 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) RE-ESTABLISH YOUR STABILIZED CONSTRUCTION ENTRANCE REQUIRED BY YOUR SWPPP. 2) LOWER, BENCH AND/OR REMOVE STOCKPILED MATERIAL ALONG SOUTH WEST CORNER OF SITE. SUPPLEMENTAL SEDIMENT CONTROLS CAN BE PLACED AROUND STOCKPILE TO TRY AND KEEP MATERIAL FROM LEAVING THE SITE. |
|
| 11/18/2009 | STORMWATER FOLLOW-UP INSP | Continued | CONTRACTOR ON SITE, WORK HAS STARTED UP AGAIN. TEMP SEDIMENT CONTROLS IN PLACE, NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME |
|
| 11/04/2009 | STORMWATER FOLLOW-UP INSP | Not ready for Inspection | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME, NO ACTIVITY ON SITE | |
| 08/12/2009 | STORMWATER FOLLOW-UP INSP | Continued | SEDIMENT CONTROLS ARE IN PLACE AND HAVE BEEN MAINTAINED. NO STORM WATRER CONCERNS AT THIS TIME | |
| 07/21/2009 | STORMWATER FOLLOW-UP INSP | Continued | STORM WATER SEDIMENT CONTROLS ARE IN PLACE. SITE IS IN COMPLIANCE WITH THERE SWPPP. NO CONSTRUCTION ACTIVITY ON SITE. ROW ENTRANCES HAVE BEEN INSTALLED. |
|
| 06/24/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
| 05/18/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO STORM WATER CONCERNS/ NO ACTIVITY ON SITE/ NO CONSTRUCTION BEING DONE?? | |
| 04/28/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
| 04/21/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. SWEEP UP TRACKED SOIL OFF OF PUBLIC ROADWAYS ON A ROUTINE BASIS. |