Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/25/2009 | ENGINEERING PRE-CONSTRUCTION | Approved | 1) DISCUSSED SWPPP AND GRADING ISSUES W/ SUPERINTENDENT (MIKE JOHNSON -CHESNUT CONSTR 275-0421). 2) PROVIDE A SIGNED COPY OF YOUR NOI ON SITE 3) SLOPES 3:1 OR LESS = REVEGETATED / SLOPES > 3:1 = AMORED ROCK RIP RAP. 4) BMP'S SELF INSPECTIONS REQUIRED 1/MONTH. DOCUMENT INSPECTIONS. 5) REPLACE SEDIMENT IF EFFECTIVENESS IS REDUCED >50%. 6) POST A COPY OF YOUR NOI AND/OR AZPDES ATHORIZATION NUMBER ON SITE. 7) SWEEP TRACKING ROUTINELY. CALL FOR INSPECTION WHEN CONTROLS HAVE BEEN INSTALLLED. |