Permit: T07BU02413


Addresses:

4328 N ORACLE RD


Inspection Status: Approved

Inspection History: GRADING - INTERMEDIATE

Permit Number - T07BU02413

Inspection Description - GRADING - INTERMEDIATE

Inspection Status - Approved

Date Description Inspector Results Comments
02/23/2009 GRADING - INTERMEDIATE Approved
08/22/2008 GRADING - INTERMEDIATE Partial Approval CLARIFICATION ON HAND-RAILING INSTALLATION AT 8' SIDEWALK ALONG SOUTH PERIMETER.
07/24/2008 GRADING - INTERMEDIATE Correction Required SPOKE WITH SITE SUPERINTENDENT AND THE ENGINEER OF RECORD ABOUT THE VERTICAL CURBING SHOWN BEING CONSTRUCTED AT THE ENTRANCE OF BLDG#9 ON THE APPROVED GRADING PLAN. THEY WANT TO BUILD THE ENTRANCE AT GRADE WITH THE ADJACENT VEHICULAR TRAVEL LANE.
PER COT DEV. STD. 2-08.4.1 - SIDEWALKS WITHIN A PROJECT MUST BE PHYSICALLY SEPARATED FROM ANY VEHICULAR TRAVEL LANE BY MEANS OF CURBING, GRADE SEPARATION, BARRIERS, RAILINGS, OR OTHER MEANS, EXCEPT AT CROSSWALKS.

BUILD THE BLDG#9 ENTRANCE PER APPROVED PLAN OR SUBMIT A REVISED GRADING PLAN SHOWING ONE OF THE ALTERNATIVE MEANS OF PHYSICALLY SEPARATING THE SIDEWALK ENTRANCE FROM THE VEHICULAR TRAVEL LANE.
07/23/2008 GRADING - INTERMEDIATE Correction Required DISCUSSED PHASING PLAN SPECIFICS FOR OBTAINING A C OF O FOR BUILDING #9 (T07CM04788).
MINIMUM REQUIREMENTS FOR C OF O APPROVAL FOR ENGINEERING ARE AS FOLLOWS:

1) SAFE ACCESS FOR PUBLIC
2) SEPARATE REMAINING CONSTRUCTION ACTIVITY FROM BLDG #9.
3) PROVIDE TRASH CONTAINER FOR BLDG.
4) COMPLETE ALL DRAINAGE STRUCTURES ON AND AROUND BLDG.
5) PROVIDE REQUIRED AMOUNT OF PARKING FOR OCCUPANTS.

THERE IS NO VERTICAL SEPARATION FOR 70 FEET AT THE FRONT OF THE BLDG FACING THE PARKING LOT. GRADING PLAN CROSS SECTION SHOWS A VERTICAL CURB.

SE CORNER OF SITE ELEVATION DIFFERENCE BETWEEN PARKING LOT AND ADJACENT 8' SIDEWALK IS APPROXIMATELY 12-18" . CONTRACTOR MUST EITHER REMOVE SIDEWALK AND RE-GRADE TO MEET LOT ELEVATION OR INSTALL A HANDRAILING ALONG THE SIDEWALK AND INSTALL BANK PROTECTION ALONG THE AREA.
07/14/2008 GRADING - INTERMEDIATE Correction Required TOOK A LOOK AT NORTH SIDE OF WAREHOUSE BLDG ALONG SOUTH SLOPE OF BASIN. RETAINING WALL PARTIALLY BUILT, NO GROUTED ROCK RIP/RAP INSTALLED. NO APPROVED REVISION, NO APPROVED PHASE PLAN.
07/07/2008 GRADING - INTERMEDIATE Correction Required CHANGE TO NE BASIN, NEED TO INSTALL TOE-DOWN WITH #4 RE-BAR AND GROUTED ROCK RIP RAP ON SOUTH SLOPE OF BASIN. CONTRACTOR HAS A DRAWING OF THE CHANGE STAMPED BY THE ENGINEER OF RECORD - NEED COT ENGINEERING APPROVAL FOR FINAL GRADING ACCEPTANCE.

NEED AN APPROVED PHASING PLAN PRIOR TO APPROVAL FOR TEMP C OF O FOR CONSTRUCTED BLDG ON NE CORNER OF SITE.
02/25/2008 GRADING - INTERMEDIATE Correction Required MET WITH SUPERINTENDENT TO DISCUSS APPROVED GRADING PLAN AND SOME PROPOSED CHANGES BEING MADE.
PROVIDE AN APPROVED GRADING PLAN FOR INSPECTIONS TO INCLUDE ALL APPROVED REVISIONS AND CHANGES.

ANY CHANGES MUST BE PROVIDED BY THE ENGINEER OF RECORD AND BE APPROVED BY THE CITY OF TUCSON.

CONCERNS INCLUDE: SIDEWALK ALONG NW CORNER.
PAAL WIDTH BETWEEN BLDGS AT NORTH SIDE NEAR LOADING AREA AND TRASH ENCLOSURE.
ELEVATIONS AT SURFACE DRAINAGE OUTLETS.
PROXIMITY OF BLDGS IN RELATION TO EXISTING RET/DET BASINS ALONG WEST SIDE.