Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T07BU02413
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/22/2008 | STORMWATER FOLLOW-UP INSP | Approved | ||
08/13/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | COMPLAINT ISSUED BY ADEQ FOR DUST AND SOIL/SEDIMENT IN STREET AT NORTH SIDE OF SITE (COMPLAINT #4716 8/7/08). 1) STORM WATER PERIMETER CONTROLS HAVE BEEN RE-ESTABLISHED. 2) CONSTRUCTION ENTRANCE/EXIT ONTO WETMORE HAS BEEN SWEPT AND WILL CONTINUE TO BE SWEPT ROUTINELY UNTIL THE AREA IS PAVED, (APPROX 1 WEEK). 3) THE MAJORITY OF THE PARKING AREA HAS BEEN PAVED - NO DUST PRESENT. 4) SUPERINTENDENT HAS BEEN INFORMED OF THE COMPLAINT AND HAS COOPERATED THROUGHOUT CONSTRUCTION. |
|
08/08/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) MOVE PORT-A-JON AWAY FROM LOW AREA AND AWAY FROM RET/DET BASIN. 2) INSTALL, MAINTAIN, AND USE A CONCRETE/MATERIALS WASH-OUT. 3) RE-ESTABLISH SEDIMENT CONTROLS ALONG WEST PERIMETER. 4) REMOVE EQUIP AND MATERIALS OFF OF SEDIMENT CONTROLS 5) PROVIDE A STABILIZED CONSTRUCTION ENTRANCE/EXIT AT NORTH ACCESS OR PAVE IT. COMPLY BY 10 DAY FROM DATE. NON-COMPLIANCE WILL RESULT IN AN NOV |
|
07/07/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | REPAIR ALL SEDIMENT CONTROLS ALONG PERIMETER OF SITE PER YOUR PLAN - DOCUMENT ALL SELF INSPECTIONS AND MAINT PERFORMED. | |
05/20/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) CONTINUE TO SWEEP UP TRACKED SOIL OFF OF PARKING AREA AND PUBLIC ROADWAYS DAILY. 2) ENSURE A DESIGNATED CONCRETE/MATERIALS WASH OUT IS INSTALLED AND USED AND WASTE IS DISPOSED OF PROPERLY. 3) POST A COPY OF YOUR NOI ON SITE. 4) PERFORM STORM WATER SELF INSPECTIONS PER YOUR SWPPP AND DOCUMENT THEM. 5) SHOW ANY CHANGES TO YOUR APPROVED SWPPP ON THE SWPPP DRAWING. |
|
05/20/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. 2) PROVIDE STATEMENT FROM THE ENGINEER OF RECORD STATING THAT RET/DET BASIN #12 VOLUME HAS CHANGED FROM THE ORIGINAL DESIGN VOLUMES SHOWN ON THE GRADING PLAN AND DEVELOPMENT PLAN. |