Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/07/2009 | GRADING - INTERMEDIATE | Approved | ||
| 04/02/2009 | GRADING - INTERMEDIATE | Partial Approval | H/C PARKING NEEDS SIGNS AND WHEEL STOPS BIKE LOCKERS NOT INSTALLED YET ADDRESS PONDING AT NW CORNER OF BLDG PROVIDE STAMPED PLAN W/ BUBBLER BOX CHANGE PROVIDE STAMPED PLAN FOR PHASING OF W DRIVEWAY (TO INCLUDE PREVIOUS ACCESSIBLE ROUTE) |
|
| 02/26/2009 | GRADING - INTERMEDIATE | Partial Approval | WALKED SITE WITH SUPER PROJECT SCHEDULED TO CLOSE OUT END OF MARCH DISCUSSED STABILIZATION AND PHASING |
|
| 02/02/2009 | GRADING - INTERMEDIATE | Partial Approval | DRIVEWAY ENTRANCE HAS BEEN CUT ON WEST SIDE OF SITE PER MATT FLICK THIS MUST BE RESTORED TO ORIGINAL CONDITION AND THE CHANGE MADE TO THE GRADING/DP |
|
| 01/06/2009 | GRADING - INTERMEDIATE | Partial Approval | -BASIN OUTLET PIPE ON WEST SIDE OF SITE 2B MODIFIED AT PIPE OUTLET W/ A PLUNGE BASIN AND SWALE -PHASE LINE ON TRANSPORTATION PLANS 2 SHOW NO DRIVEWAY ON WEST SIDE OF PROPERTY |
|
| 12/02/2008 | GRADING - INTERMEDIATE | Partial Approval | VERTICAL WORK CONTINUING INFRASTRUCTURE BEING INSTALLED NOW |
|
| 10/22/2008 | GRADING - INTERMEDIATE | Partial Approval | REVIEWED PLANS ON SITE -THERE HAS BEEN A CHANGE MADE TO SCUPPERS-TYPE II NOW VS. TYPE I ON PLAN NO PLAN REVISION NECESSARY -DISCUSSED HYDROSEED FOR UNDEVELOPED PAD AND DISTURBED AREAS -BASIN CERTIFICATION MUST BE RECEIVED BEFORE FINAL GRADING APPROVAL |