12/15/2010 STORMWATER FOLLOW-UP INSP Continued NO CONCERNS AT THIS TIME.
06/23/2010 STORMWATER FOLLOW-UP INSP Approved NO CONCERNS AT THIS TIME, BUILDING IS COMPLETE AND IS BEING UTILIZED AS STORAGE FOR THE SITE OPERATION. ROUGH GRADING IS STILL NEEDED PRIOR TO APPROVING THE TEMPORARY C OF O
09/21/2009 STORMWATER FOLLOW-UP INSP Partial Approval controls OK
03/24/2009 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS
CONTROLS IN PLACE AND BEING MAINTAINED
02/19/2009 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS AT THIS TIME
MAINTENANCE WORK IS BEING PERFORMED REGULARLY BY CHRIS
01/28/2009 STORMWATER FOLLOW-UP INSP Partial Approval CP-AZPDES INFORMATION TO BE POSTED FOR EACH LOT
UNK-SWPPP LOG BOOK TO BE UPDATED
PA-GENERAL HOUSEKEEPING TO BE ADDRESSED
01/14/2009 STORMWATER FOLLOW-UP INSP Partial Approval MET WITH CHRIS GUINTER 940-0563

CORRECTION REQUIRED 10 DAY FOLLOW UP
ITEMS TO BE ADDRESSED:
-AZPDES INFORMATION TO BE POSTED FOR EACH LOT
-SWPPP LOG BOOK TO BE UPDATED
-GENERAL HOUSEKEEPING TO BE ADDRESSED
01/06/2009 STORMWATER FOLLOW-UP INSP Correction Required NO CHANGE IN SITE

SENT 2ND CORRECTION
12/02/2008 STORMWATER FOLLOW-UP INSP Correction Required PERFORM MAINTENANCE ON SWPPP CONTROLS
SWEEP UP TRACK OUT
CONTAIN ALL CONSTRUCTION MATERIAL/DEBRIS
10/28/2008 STORMWATER FOLLOW-UP INSP Correction Required CONTAIN ALL CONSTRUCTION DEBRIS
07/24/2008 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS
07/08/2008 STORMWATER FOLLOW-UP INSP Correction Required PAD POURED
TRACK OUT NEEDS TO BE SWEPT
05/30/2008 STORMWATER FOLLOW-UP INSP Correction Required SAND BAGS STILL NOT PLACED
STREET STILL NEEDS TO BE SWEPT