Inspection History Details
Inspection Status: Continued
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/15/2010 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME. | |
| 06/23/2010 | STORMWATER FOLLOW-UP INSP | Approved | NO CONCERNS AT THIS TIME, BUILDING IS COMPLETE AND IS BEING UTILIZED AS STORAGE FOR THE SITE OPERATION. ROUGH GRADING IS STILL NEEDED PRIOR TO APPROVING THE TEMPORARY C OF O | |
| 09/21/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | controls OK | |
| 03/24/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS CONTROLS IN PLACE AND BEING MAINTAINED |
|
| 02/19/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS AT THIS TIME MAINTENANCE WORK IS BEING PERFORMED REGULARLY BY CHRIS |
|
| 01/28/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | CP-AZPDES INFORMATION TO BE POSTED FOR EACH LOT UNK-SWPPP LOG BOOK TO BE UPDATED PA-GENERAL HOUSEKEEPING TO BE ADDRESSED |
|
| 01/14/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | MET WITH CHRIS GUINTER 940-0563 CORRECTION REQUIRED 10 DAY FOLLOW UP ITEMS TO BE ADDRESSED: -AZPDES INFORMATION TO BE POSTED FOR EACH LOT -SWPPP LOG BOOK TO BE UPDATED -GENERAL HOUSEKEEPING TO BE ADDRESSED |
|
| 01/06/2009 | STORMWATER FOLLOW-UP INSP | Correction Required | NO CHANGE IN SITE SENT 2ND CORRECTION |
|
| 12/02/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | PERFORM MAINTENANCE ON SWPPP CONTROLS SWEEP UP TRACK OUT CONTAIN ALL CONSTRUCTION MATERIAL/DEBRIS |
|
| 10/28/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | CONTAIN ALL CONSTRUCTION DEBRIS | |
| 07/24/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS | |
| 07/08/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | PAD POURED TRACK OUT NEEDS TO BE SWEPT |
|
| 05/30/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | SAND BAGS STILL NOT PLACED STREET STILL NEEDS TO BE SWEPT |