Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/10/2011 | GRADING - FINAL | Approved | All items addressed, approved | |
| 12/23/2010 | GRADING - FINAL | Denied | Complete items 1,2,3,5 from the previous punch list, and install bike parking per the approved plan, remove all construction materials and debris or separate from the public, install pavers at the rear of building per plan, provide as-built drawings. | |
| 09/04/2009 | GRADING - FINAL | Denied | Complete the following prior to final 1) Install scuppers at all downspouts 2) install handrail at front ramp and landing to building 3) Install handrail at interior ramps 4) install sidewalk along south side of building 5) install loading area south side of building 6) remove gravel bags at strom inlet |