Inspection Status: Approved
Inspection History: GRADING - INTERMEDIATE
| Date |
Description |
Inspector |
Results |
Comments |
| 05/10/2011 |
GRADING - INTERMEDIATE |
|
Approved |
Approved |
| 03/14/2011 |
GRADING - INTERMEDIATE |
|
Continued |
NO WORK BEING AT IS TIME. |
| 01/11/2011 |
GRADING - INTERMEDIATE |
|
Continued |
Contractor not on site, no approved plans on site. I spoke to owner who called Arch. I told her that the EOR or Arch of record should provide a cert letter stateing that the water harvest tank system was installed per plan, provide this letter with an as-built site plan for the grading permit. |
| 09/04/2009 |
GRADING - INTERMEDIATE |
|
Approved |
Approved |
| 09/22/2008 |
GRADING - INTERMEDIATE |
|
Partial Approval |
Met on site with super to look at stormwater piping. Contractor backfilled all piping. Contractor will need to provide letter from engineer per 11-01.16.2 (built to spec). |