Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/25/2008 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 05/19/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | WALKED SITE WITH OWNER LOOKED AT SIDEWALK FORMS ADDRESSED TRACK OUT |
|
| 05/07/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | TRACK OUT IS FROM OTHER LOTS NO STORMWATER CONCERNS FOR THIS PROJECT |
|
| 04/22/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS WORK CONTINUING ON BUILDING NO SUBSTANTIAL SITE WORK |
|
| 04/08/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | NO SCE AT SOUTH ENTRANCE ROADWAY NEEDS TO BE SWEPT |
|
| 02/27/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | ROUGH GRADING CP PAD FORMED UP CONTROLS IN PLACE OUTSIDE FENCE |
|
| 01/24/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | TRACK OUT ONTO CMO DE CAFE |