Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/09/2007 | ENGINEERING PRE-CONSTRUCTION | Approved | MET WITH DANNY AND RICHARD ON SITE THIS IS A QUICK SCHEDULE (2 WEEKS) ALL HAULING WILL BE DONE ON SITE PER THE CONDITIONS OF THE PERMIT AN EL CERT IS REQUIRED BEFORE FINAL APPROVAL |