Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/30/2014 | GRADING - FINAL | Approved | PHASE 1 COMPLETE; PHASE 2 REMOVED FROM THIS ACTIVITY | |
| 11/18/2008 | GRADING - FINAL | Correction Required | Spoke to Hector and Tri Miller in regards to sidewalks. If sidewalk to stay as is contractor will need approved DSMR. | |
| 11/17/2008 | GRADING - FINAL | Correction Required | Met Hector on site to look at C of O for building shell. Contractor needs to complete site work or complete site work under new permit. | |
| 10/21/2008 | GRADING - FINAL | Correction Required | Preliminary Punch List 1- Provide letter from engineer in regards to D.S. chapter XIV, section 14.2(7). Regards to drainage and detention/retention basins. 2- Remove all construction material and debris from site. 3- Clean all parking areas and trash enclosures. 4- Remove trash dumpster and port-a-potty 5- Complete all work. 6- Clean all wash out from site. 7- Address all erosion along southwest side of parking area. 8- Install all rip rap per approved drawings. 9- Install door and sidewalk to rear of trash enclosure per approved drawings (sheet 13). 10- Engineer needs to address sidewalk. Sidewalk needs to be 6.5 feet wide. Around entire building. 11- Clear the back of all sidewalk scuppers. 12- Install all bike parking. Class 1 and 2. 13- Complete all asphalt work. 14- Install all HC ramp per code. (max 8.33% and 2% cross slope) Contractor needs to complete items and call in for re-inspection before C of O issued. |
|
| 10/21/2008 | GRADING - FINAL | Correction Required | Preliminary Punch List 1- Provide letter from engineer in regards to D.S. chapter XIV, section 14.2(7). Regards to drainage and detention/retention basins. 2- Remove all construction material and debris from site. 3- Clean all parking areas and trash enclosures. 4- Remove trash dumpster and port-a-potty 5- Complete all work. 6- Clean all wash out from site. 7- Address all erosion along southwest side of parking area. 8- Install all rip rap per approved drawings. 9- Install door and sidewalk to rear of trash enclosure per approved drawings (sheet 13). 10- Engineer needs to address sidewalk. Sidewalk needs to be 6.5 feet wide. Around entire building. 11- Clear the back of all sidewalk scuppers. 12- Install all bike parking. Class 1 and 2. 13- Complete all asphalt work. 14- Install all HC ramp per code. (max 8.33% and 2% cross slope) Contractor needs to complete items and call in for re-inspection before C of O issued. |