Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/30/2014 | STORMWATER FOLLOW-UP INSP | Approved | PHASE 1 COMPLETE; PHASE 2 REMOVED FROM THIS ACTIVITY | |
| 08/21/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | Issued correction notice. Contractor has 4 days to: 1- Clean all wash out from around site. 2- Provide wash out area and ensure use. 3- Clean silt from parking lot. 4- Install all SWPPP controls per manufacture requirements. If items are not addressed I will issue a notice of violation. Spoke to site super in regards to items. |
|
| 05/08/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to: 1- Sweep track out from site. 2- Repair controls a long south side of project. 3- Provide new N.O.I. 4- Hector needs to contact Ron Brown in regards to ADA access (truncated domes) |
|
| 03/17/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to: 1- Clean street. 2- Uncover wattle around perimeter. 3- Clean up wash out around site. 4- Address items deleted on approved grading plan. Spoke to site super in regards to. Super said they are working on a revised grading plan now. |