Inspection Status: Continued
Inspection History: STORMWATER FOLLOW-UP INSP
| Date |
Description |
Inspector |
Results |
Comments |
| 05/28/2013 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
PROVIDE APPROVED WASH OUT. |
| 03/21/2013 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
SWPPP CONTRLOS HAVE BEEN INSTALLED AROUND LOT #5. |
| 12/10/2012 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
G.C NOT ON SITE SWPPP CONTROLS NEED SOME REPAIR. |
| 08/07/2009 |
STORMWATER FOLLOW-UP INSP |
|
Correction Required |
Contractor on-site reapiring strom controls |
| 07/24/2009 |
STORMWATER FOLLOW-UP INSP |
|
Correction Required |
Swppp controls in pour condition erosion blow out at the end of cul-de-sac needs to be stabilized. |
| 02/25/2009 |
STORMWATER FOLLOW-UP INSP |
|
Correction Required |
SWPPP CONTROLS NEED SOME MAINTENANCE. |