Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/14/2012 | ENGINEERING PRE-CONSTRUCTION | Denied | LOT #3 NOT INSTALLED PER APPROVED PLANS. | |
| 05/20/2008 | ENGINEERING PRE-CONSTRUCTION | Approved | PRE CON DOCUMENT RETURNED, OK TO KEEP SAGUARO ON EAST SLOPE. | |
| 04/29/2008 | ENGINEERING PRE-CONSTRUCTION | Partial Approval | PRE-CON MEETING WITH RANDY (JANC) 603-7899 1. POST AZPDES AUTHORIZATION. 2. READ SWPPP AND PRE-CON DOCUMENTS. 3. COPY PRE-CON DOCUMENT AND RETURN TO INSPECTOR 4. STRAW WATTLER TO BE USED IN LIEU OF SILT FENCE AT ROADWAY, CONTRACTOR TO INSTALL SWPPP CONTROLS SIMULTANEOUS WITH SLIGHT CLEARING FOR ACCESS. 5. CALL FOR FULL APPROVAL OF PRE-CON AND INSTALL OF CONTROLS INSPECTIONS. |