Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/04/2010 | ENGINEERING PRE-CONSTRUCTION | Approved | ||
| 11/28/2007 | ENGINEERING PRE-CONSTRUCTION | Partial Approval | ON SITE MEET WITH EEC ENGINEER KEN, BILL KOLT DIAMOND VENTURES, BILL KOCH EEC DISCUSSED CERTIFICATION PROCESS AND WHAT INSPECTIONS WILL BE DONE DURING BUILD PROCESS |
|
| 10/29/2007 | ENGINEERING PRE-CONSTRUCTION | Partial Approval | MET ON SITE WITH SAM WITH ARCHER AND LANCE PETERSON WITH HUNTER CONSTRUCTION 954-3043 WE DISCUSSED THE SWPPP AND POSSIBLE CHANGES TO THE SWPPP ANOTHER MEET TO BE HELD WHEN GRADING LIMITS ARE GRUBBED AND CONTROLS ARE BEING INSTALLED |
|
| 10/24/2007 | ENGINEERING PRE-CONSTRUCTION | Partial Approval | MET ON SITE WITH ARCHER AND TARGET SAM COMPTON 602-684-2868 BOB SCURLOCK 954-465-7331 HUNTER HAS BEEN CONTRACTED TO DO GRADING WORK-THERE IS TO MEET ANOTHER MEET WITH THE SUPERINTENDANT FROM HUNTER BEFORE GRUBBING/GRADING WORK IS STARTED |
|
| 10/08/2007 | ENGINEERING PRE-CONSTRUCTION | Not ready for Inspection | NO WORK STARTED |