Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
Permit Number - T07BU01927
Inspection Description - ENGINEERING PRE-CONSTRUCTION
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/24/2008 | ENGINEERING PRE-CONSTRUCTION | Approved | SUPERINTENDENT: ERIC 1. PROVIDE A LETTER OF CERTIFICATION FROM THE ARIZONA REGISTERED P.E. THAT CERTIFIES THAT THE PROJECT AND THE DRAINAGE IMPROVEMENTS ARE CONSTRUCTED TO THE APPROVED GRADING PLANS. LETTER IS REQUIRED PRIOR TO C OF O APPROVAL. 2. PROVIDE AN ENGINEERED AND STAMPED DETAIL THAT SHOWS THE TIE-IN CONNECTION BETWEEN NEW CONCRETE AND EXISTING CONCRETE IN DRAINAGE CHANNEL. 3. MAINTAIN A CLEAR, CLEAN, COMPACTED CHANNEL BOTTOM AND COMPACTED SLOPES UNTIL THE CONCRETE CHANNEL IS COMPLETED. |