Permit: T07BU01882


Addresses:

306 N ALVERNON WY


Inspection Status: Approved

Inspection History: GRADING - INTERMEDIATE

Permit Number - T07BU01882

Inspection Description - GRADING - INTERMEDIATE

Inspection Status - Approved

Date Description Inspector Results Comments
05/19/2010 GRADING - INTERMEDIATE Approved Approved
03/04/2010 GRADING - INTERMEDIATE Partial Approval Sidewalk installed from Alvernon to parking lot. Some minor work continuing on basin at north edge of site.
09/18/2009 GRADING - INTERMEDIATE Partial Approval Went over punch list and bond amount with owner and contractor, all items that are unfinished were included in the bond.
Detention basin at north property roughed in, HC parking needs asphalt wedge infront and to be installed in back, entrance only signs need to be installed, walls need to be finished, bike parking needs to be installed.
08/26/2009 GRADING - INTERMEDIATE Partial Approval Checked for activity nothin new sense I gave them my punch list
08/17/2009 GRADING - INTERMEDIATE Partial Approval No activity at site, gate at fire entrance in but does not look like plan detail. HC parking at front of building has been repaved. Walls along Alvernon not constructed, or the screen wall at dumpster in rear of development.
07/10/2009 GRADING - INTERMEDIATE Partial Approval See final grading preliminary punch list.
07/02/2009 GRADING - INTERMEDIATE Continued HC ramps poured in parking lot, frontage improvements along Alervnon in progress
06/22/2009 GRADING - INTERMEDIATE Continued Delivered coorection notice for parking light pole height and masonary wall finish, also discussed downspouts driected at sidewalks that need scuppers. Super will discuss with eng.
06/17/2009 GRADING - INTERMEDIATE Continued Checked parking lot paving and informed Don that the outside of the CMU wall along the east PL needs to be finished with stucco.
05/20/2009 GRADING - INTERMEDIATE Correction Required Parking area still a mess, asphalt not patched, temp fence on installed in parking area.
02/03/2009 GRADING - INTERMEDIATE Correction Required 1. PROVIDE NO MORE THAN 2% CROSS SLOPE IN ALL DIRECTIONS AT H/C PARKING SPACES.
2. PROVIDE MAX. 2% CROSS SLOPE AND 5% RUN SLOPE ON ALL SIDEWALKS.
3. PROVIDE NO MORE THAN 8.33% SLOPE ON ALL RAMPS.
12/05/2008 GRADING - INTERMEDIATE Continued SOME CURBING HAS BEEN CONSTRUCTED WEST OF BLDG. #1.
CONFERENCE BLDG #3 WAS CALLED IN FOR ENGINEERING APPROVAL, BUT WAS DENIED DUE TO UN-FINISHED CONDITION OF SITE WORK INCLUDING CONSTRUCTION OF VEHICULAR PARKING AND PEDESTRIAN ACCESS.
04/11/2008 GRADING - INTERMEDIATE Partial Approval NEW SUPERINTENDENT RON 974-9151
ELEVATIONS OF NEW PADS ON NORTH END OF PROJECT APPEAR TO MATCH ELEVATIONS ON GRADING PLANS.
PROJECT SITE HAS EXPANDED TO THE SOUTHWEST, NEEDS SWPPP CONTROLS.
12/06/2007 GRADING - INTERMEDIATE Partial Approval ROUGH GRADING IN PROGRESS.
12/03/2007 GRADING - INTERMEDIATE Partial Approval ROUGH GRADING IN PROGRESS
11/29/2007 GRADING - INTERMEDIATE Partial Approval ROUGH GRADING IS IN PROGRESS