Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - INTERMEDIATE
Permit Number - T07BU01882
Inspection Description - GRADING - INTERMEDIATE
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/19/2010 | GRADING - INTERMEDIATE | Approved | Approved | |
| 03/04/2010 | GRADING - INTERMEDIATE | Partial Approval | Sidewalk installed from Alvernon to parking lot. Some minor work continuing on basin at north edge of site. | |
| 09/18/2009 | GRADING - INTERMEDIATE | Partial Approval | Went over punch list and bond amount with owner and contractor, all items that are unfinished were included in the bond. Detention basin at north property roughed in, HC parking needs asphalt wedge infront and to be installed in back, entrance only signs need to be installed, walls need to be finished, bike parking needs to be installed. |
|
| 08/26/2009 | GRADING - INTERMEDIATE | Partial Approval | Checked for activity nothin new sense I gave them my punch list | |
| 08/17/2009 | GRADING - INTERMEDIATE | Partial Approval | No activity at site, gate at fire entrance in but does not look like plan detail. HC parking at front of building has been repaved. Walls along Alvernon not constructed, or the screen wall at dumpster in rear of development. | |
| 07/10/2009 | GRADING - INTERMEDIATE | Partial Approval | See final grading preliminary punch list. | |
| 07/02/2009 | GRADING - INTERMEDIATE | Continued | HC ramps poured in parking lot, frontage improvements along Alervnon in progress | |
| 06/22/2009 | GRADING - INTERMEDIATE | Continued | Delivered coorection notice for parking light pole height and masonary wall finish, also discussed downspouts driected at sidewalks that need scuppers. Super will discuss with eng. | |
| 06/17/2009 | GRADING - INTERMEDIATE | Continued | Checked parking lot paving and informed Don that the outside of the CMU wall along the east PL needs to be finished with stucco. | |
| 05/20/2009 | GRADING - INTERMEDIATE | Correction Required | Parking area still a mess, asphalt not patched, temp fence on installed in parking area. | |
| 02/03/2009 | GRADING - INTERMEDIATE | Correction Required | 1. PROVIDE NO MORE THAN 2% CROSS SLOPE IN ALL DIRECTIONS AT H/C PARKING SPACES. 2. PROVIDE MAX. 2% CROSS SLOPE AND 5% RUN SLOPE ON ALL SIDEWALKS. 3. PROVIDE NO MORE THAN 8.33% SLOPE ON ALL RAMPS. |
|
| 12/05/2008 | GRADING - INTERMEDIATE | Continued | SOME CURBING HAS BEEN CONSTRUCTED WEST OF BLDG. #1. CONFERENCE BLDG #3 WAS CALLED IN FOR ENGINEERING APPROVAL, BUT WAS DENIED DUE TO UN-FINISHED CONDITION OF SITE WORK INCLUDING CONSTRUCTION OF VEHICULAR PARKING AND PEDESTRIAN ACCESS. |
|
| 04/11/2008 | GRADING - INTERMEDIATE | Partial Approval | NEW SUPERINTENDENT RON 974-9151 ELEVATIONS OF NEW PADS ON NORTH END OF PROJECT APPEAR TO MATCH ELEVATIONS ON GRADING PLANS. PROJECT SITE HAS EXPANDED TO THE SOUTHWEST, NEEDS SWPPP CONTROLS. |
|
| 12/06/2007 | GRADING - INTERMEDIATE | Partial Approval | ROUGH GRADING IN PROGRESS. | |
| 12/03/2007 | GRADING - INTERMEDIATE | Partial Approval | ROUGH GRADING IN PROGRESS | |
| 11/29/2007 | GRADING - INTERMEDIATE | Partial Approval | ROUGH GRADING IS IN PROGRESS |