Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T07BU01882
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/15/2010 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 03/04/2010 | STORMWATER FOLLOW-UP INSP | Partial Approval | No storm concerns at this time. | |
| 07/10/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | Complete all site work and remove temp controls | |
| 02/03/2009 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. PROVIDE ROCK FOR STABILIZED CONSTRUCTION ENTRANCE 2. SWEEP SEDIMENT AND SOIL TRACKED INTO THE R.O.W. 3. MAINTAIN SWPPP CONTROLS ON NORTH PERIMETER. |
|
| 12/04/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTION NOTICE ISSUED FOR COMPLIANCE WITHIN 7 DAYS OR A NOTICE OF VIOLATION WILL BE ISSUED. PLEASE CALL 740-6970 TO SCHEDULE STORMWATER FOLLOW-UP INSPECTION #09152. 1. PROVIDE SWPPP CONTROLS AT S.E CORNER OF SITE NEAR BLDG, #10 (A.K.A. BLDG 17) 2. REJUVENATE STABILIZED ROCK ENTRANCE AT N.E. CORNER OF SITE. 3. CUT DOWN STOCKPILES TO MAX. 6' HEGHT. |
|
| 09/17/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | RON 974-9151 1. MAINTAIN THE STRAW WATTLE ON THE WEST PERIMETER, THE WATTLE NEEDS TO BE STAKED AT 6' INTERVALS AT THE EDGE OF THE DISTURBED SOIL AREA. 2. PROVIDE SOIL STABILIZATION ON DISTURBED SOIL AREA WEST OF THE STRAW WATTLE. INSPECTOR SUGGESTS PEA GRAVEL FOR TEMPORARY STABILIZATION. |
|
| 07/09/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | COMPLETE ITEMS 1,3,&6 OF PREVIOUS INSPECTION AND CLEAN UP R.O.W BEFORE AFTERNOON RAIN EVENT. | |
| 06/23/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. SWEEP STREET NORTH OF PROJECT. 2. WATER DOWN SITE TO CREATE A CRUST TO PREVENT DUST AT ALL TIMES. 3. REMOVE EXCESS RUBBLE, DEBRIS AND EXCESS SOIL. 4. CLEAN UP CONCRETE WASHOUT AT LOCATIONS NOT IN DESIGNATED CONCRETE WASHOUT CONTAINER. 5. RE-INSTALL STABILIZED CONSTRUCTION ENTRANCE WITH 3-6" ANGULAR ROCK 30'X50'X6" DEEP. 6. PROVIDE SWPPP CONTROLS AT NE CORNER OF SITE. |
|
| 06/16/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. CLEAN UP CONCRETE WASHOUT AND RUBBLE NOT IN DESIGNATED WASHOUT LOCATION. 2. REMOVE EXCESS RUBBLE AND DEBRIS. 3. REMOVE ALL MATERIALS ON STRAW WATTLE. 4. RELOCATE CONSTRUCTION ENTRANCE DURING UTILITY UNDERGROUND CONSTRUCTION AND SHOW ON THE SWPPP. (30'X50'X6" OF 3-6" FRACTURED ROCK). |
|
| 04/22/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | ||
| 04/14/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. UPDATE AZPDES POSTING WITH RON'S # 954-9151 2. PROVIDE SWPPP CONTROLS AT SW PERIMETER OF SITE. 3. UPDATE THE SWPPP. |
|
| 02/11/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | R/D BASIN HAS BEEN ROUGH GRADED, SCE AND SWPPP OK | |
| 12/26/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS | |
| 12/05/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO SEDIMENT RELEASE OR TRACKING WAS VISIBLE. THE CONTROLS AT THIS SITE WORKED WELL DURING THE RAIN EVENT 11/30 TO 12/1. | |
| 11/30/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS. | |
| 11/29/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | RAIN IS FALLING. STRAW WATTLE AT SCE NEEDS TO WRAP ALONG SIDE OF SCE. | |
| 11/21/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | CONTACT: ROB KONIECKI 307-4137 HICKAM CONSTRUCTION |