Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T07BU01882


Addresses:

306 N ALVERNON WY

Inspection Status: Approved

Inspection History: ENGINEERING PRE-CONSTRUCTION

Date Description Inspector Results Comments
11/27/2007 ENGINEERING PRE-CONSTRUCTION Approved ROB KONIECKI WILL COPY PRE-CON DOCUMENT AND GIVE THE ORIGINAL TO THE INSPECTOR.
11/19/2007 ENGINEERING PRE-CONSTRUCTION Partial Approval 1. REVIEW, FILL OUT THE PRE-CON FORM, AND COPY FOR THE INSPECTOR.
2. OKAY TO GRUB PERIMETER TO FACILITATE INSTALLATION OF SWPPP CONTROLS, BUT NOT WHEN RAIN EXPECTED.
3. POST AZPDES AUTHORIZATION.
4. CALL IN FOR INSTALL OF CONTROLS INSPECTION.