Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T07BU01855

Parcel: 11006013E

Inspection Status: Approved

Inspection History: STORMWATER INSTALL OF CONTROLS

Permit Number - T07BU01855

Inspection Description - STORMWATER INSTALL OF CONTROLS

Inspection Status - Approved

Date Description Inspector Results Comments
12/12/2007 STORMWATER INSTALL OF CONTROLS Approved I REVIEWED THE SWPPP FOR THIS SITE WITH TOM HAMILTON.
THE SITE WAS SEEDED WITH 35 LBS OF SEED ON 12-12-07 DURING A 3 DAY RAIN EVENT. ANOTHER 3 DAY RAIN EVENT ENDED TODAY. THUS THIS SITE SHOULD HAVE ENOUGH MOISTURE TO GERMINATE THE SEEDS.
MR. HAMILTON WILL MONITOR THE SITE FOR SWPPP AND GERMINATION ACTIVITY.
10/04/2007 STORMWATER INSTALL OF CONTROLS Correction Required THE SITE IS BEING CLEARED OF ALL DEMO DEBRIS.
WORK WILL CONTINUE TOMORROW AND WILL BE READY FOR INSPECTION NEXT WEEK.
09/11/2007 STORMWATER INSTALL OF CONTROLS Correction Required TOM HAMILTON WILL PICK UP THE DEMO PERMIT TODAY.
TOM PATTERSON WILL DEVELOP A SWPPP FOR THE SITE.
A STABILIZED CONSTRUCTION ENTRANCE HAS BEEN PROVIDED. THE SITE WILL BE WATERED DOWN TO PROVIDE A CRUST ON DISTURBED SOIL AREAS.
09/10/2007 STORMWATER INSTALL OF CONTROLS Correction Required THE DEMO PERMIT HAS NOT BEEN ISSUED. SITE EARTH DISTURBANCE IS OVER 1 ACRE.

ABE SLILATY 607-743-3499 - PROPERTY OWNER
LAUREN SHELDON - CONTRACTOR FROM HUACHUCA CITY
CLAY AITKEN - 456-1521 SITE SUPT. FOR L SHELDON CO.
TOM HAMILTON 444-1831 OWNER'S SITE SUPT.

15 BUILDINGS HAVE BEEN DEMO'DD AT THIS SITE FOR (3) ADDRESSES 4002, 4032, AND 4068 E. FORT LOWELL

TOM HAMILTON SHOWED ME A SITE PLAN THAT HAS ENGINEERING APPROVAL BY LOREN MAKUS ON 8/31/07 FOR A 7.6572 ACRE SITE. THIS SITE WILL EVENTUALLY BE DEVELOPED AS FORT LOWELL PARK LLC.

MR. SHELDON IS SICK TODAY, SO THE DEMO PERMIT WILL BE PICKED UP FROM DOWNTOWN TOMORROW.

I INFORMED MR. HAMILTON THAT THE SITE REQUIRED A STORMWATER POLLUTION PREVENTION PLAN, SEDIMENT AND EROSION CONTROLS, STABILIZED CONSTRUCTION ENTRANCE AND N.O.I.FOR AZPDES.

I SUGGESTED THAT THE SITE BE WATERED DOWN TO CREATE A CRUST ON ALL DISTURBED SOIL AND A STABILIZED CONSTRUCTION ENTRANCE PENDING THE DEVELOPMENT OF A SWPPP.