Inspection Status: Closed
Inspection History: GRADING - CHECK FOR ACTIVITY
| Date |
Description |
Inspector |
Results |
Comments |
| 04/22/2020 |
GRADING - CHECK FOR ACTIVITY |
|
Closed |
SITE WAS NOT CONSTRUCTED PER THESE APPROVED PLANS, SEE ADDRESSES FOR ADDITIONAL INFORMATION UNDER NEW DEVELOPMENT PACKAGES AND THEIR INSPECTIONS. |
| 01/31/2012 |
GRADING - CHECK FOR ACTIVITY |
|
Continued |
NO CHANGES IN THE SITE AT THIS TIME. |
| 07/18/2011 |
GRADING - CHECK FOR ACTIVITY |
|
Continued |
THE CREWS ARE WORKING ON THE FOLLOWING AREAS AT THIS TIME: FORMING AND POURING THE CURB RETURNS ON THE WEST SIDE OF THE CENTER ENTRANCE, THE EAST SIDE WAS POURED LAST WEEK WITH THE MEDIAN ISLANDS ON GOLF LINKS ROAD. FORMING THE EAST AND WEST CURB RETURNS ON THE EAST ENTRANCE, PREPARING IT FOR CONCRETE LATER ON TODAY. GRADING IN THE MEDIAN ISLAND AREA ON GOLF LINKS ROAD PREPARING THE AREA FOR THE AC PLACEMENT THAT WILL HAPPEN LATER ON THIS WEEK. ALL OF THE ABOVE MENTIONED WORK IS BEING WATCHED BY THE PIA INSPECTORS FROM THE TRANSPORTATION DEPARTMENT. |
| 06/01/2011 |
GRADING - CHECK FOR ACTIVITY |
|
Continued |
CREWS CONTINUE TO WORK ON THE INSTALLATION OF BACKFILL ALONG THE NORTHSIDE OF THE RETAINING WALL AS THE MANHOLE FORMS ARE BEING REMOVED. THIS WORK SHOULD CONTINUE THROUGH THE END OF THE WEEK. |
| 04/08/2011 |
GRADING - CHECK FOR ACTIVITY |
|
Continued |
WORKING ON MOVING AND WATERING MATERIAL ON SITE, AND CONTINUING WITH THE INSTALLATION OF REBAR FOR THE RETAINING WALL ALONG THE SOUTH SIDE OF THE QUIK TRIP LOCATION. |
| 02/25/2011 |
GRADING - CHECK FOR ACTIVITY |
|
Continued |
GRADING OF THE SITE IS TAKING PLACE, RETAINING WALL FOOTER EXCAVATION WEST OF HOUGHTON, AN INSTALATION OF THE SEWER LINE FROM BONANZA TO THE SITE. THE PIPE SHOULD BE DONE BY THE END OF THE MONTH AND THE FILL WORK COMPLETED SOMETIME IN MARCH. |
| 02/07/2011 |
GRADING - CHECK FOR ACTIVITY |
|
Continued |
CREWS CONTINUE TO WORK ON EXCAVATING THE EXCESS MATERIAL AND PLACINT IT INTO THE FILL LOCATIONS, THIS IS MONITORED BY THE ENGINEER OF RECORD. VERY LIMITED DUST AND TRACK OUT AT THIS TIME. ALSO INSTALLING THE SEWER LINE ON LURENE DR., HAVE LAID APPROXIMATELY 2 BLOCKS EAST OF BONANZA AVE. |
| 01/20/2011 |
GRADING - CHECK FOR ACTIVITY |
|
Continued |
CREWS COMPLETED THE PLANT REMOVAL AND REMOVING OF ALL CACTUS INTO THE NURSERY. CONTINUEING THE FINAL WORK ON THE CACTUS GRUBBING. ALSO PLACING STORMWATER CONTROL ALONG THE SOUTH BOUNDARY. |
| 01/19/2011 |
GRADING - CHECK FOR ACTIVITY |
|
Continued |
CREW WORKING ON THE CACTUS REMOVAL, PLACING MATERIAL INTO A NURSERY AT THE NORTHWEST SIDE OF THE SITE. THIS INCLUDES THE REMAINING BARREL AND THE SAGUARO, AND STARTED THE REMOVAL OF THE EXCESS PLANT MATERIAL. |
| 10/19/2010 |
GRADING - CHECK FOR ACTIVITY |
|
Continued |
NO WORK AT THIS TIME. |