Inspection Status: Closed
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date |
Description |
Inspector |
Results |
Comments |
| 04/22/2020 |
STORMWATER INSTALL OF CONTROLS |
|
Closed |
SITE WAS NOT CONSTRUCTED PER THESE APPROVED PLANS, SEE ADDRESSES FOR ADDITIONAL INFORMATION UNDER NEW DEVELOPMENT PACKAGES AND THEIR INSPECTIONS. |
| 01/24/2011 |
STORMWATER INSTALL OF CONTROLS |
|
Continued |
INSTALLING THE FINAL STORMWATER CONTROL AND COMPLETING THE GRUBBING OF THE SITE. THE SAGUARO CACTUS STILL REMAIN IN PLACE AT THIS TIME AND WILL BE REMOVED TO THE NURSARY SOON BEFORE THE CREWS STARTS WORKING ON THE PLACEMENT OF THE FILL MATERIAL. SOME MINOR AREAS OF REFUGE STILL NEEDS TO BE HAULED FROM THIS SITE BEFORE THE FILL MATERIAL CAN BE PLACED. |
| 01/24/2011 |
STORMWATER INSTALL OF CONTROLS |
|
Approved |
INSTALLATION OF CONTROLS HAVE BEEN COMPLETED, BUT MAY BE MODIFIED AS NEEDED DURING THE DURATION OF THE SITE WORK DEPENDING ON WHAT IS NEEDED. |
| 01/21/2011 |
STORMWATER INSTALL OF CONTROLS |
|
Continued |
CREWS WORKING ON INSTALLING THE WADDLE FOR THE SITE IN THE PM AND WILL FINISH IT ON 1/24/2011. |