Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - INTERMEDIATE
Permit Number - T07BU01729
Inspection Description - GRADING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/18/2008 | GRADING - INTERMEDIATE | Approved | ||
11/04/2008 | GRADING - INTERMEDIATE | Correction Required | I MET WITH CRAIG MASTERS/DEVELOPER, TRI MILLER/RICK ENG, SEAN AND MARK/RIO WEST. 1.PROVIDE 24' PAAL AT GATES 2. PROVIDE 8.33% MAX RUN AND 2.0 MAX CROSS SLOPE ON HANDICAP RAMPS. (4) RAMPS EXCEED SLOPE SPECIFICATIONS. 3. PROVIDE 5.0% MAX. RUNNING SLOPE AND 2.0% CROSS SLOPE ON SIDEWALKS. SEE NOTES FOR PREVIOUS INSPECTION ON 10/07/08 |
|
10/07/2008 | GRADING - INTERMEDIATE | Continued | MEETING WITH CRAIG MASTERS 247-7289 TO DETERMINE REQUIREMENTS FOR OCCUPANCY OF BLDG. #3 PROJECTED FOR NOVEMBER 2008. 1. PROVIDE A C.O.T. APPROVED COPY OF THE REVISED GRADING PLAN. 2. PROVIDE A LETTER OF CERTIFICATION FROM THE AZ REGISTERED P.E. THAT CERTIFYS THE PORTION OF THE COMPLETED WORK SITE AND THE SITE DRAINAGE. 3. COMPLETE PEDESTRIAN AND VEHICLE ACCESSWAYS TO PUBLIC RIGHT OF WAYS. 4. PROVIDE ALL PARKING CALCULATED FOR BLDG. #3. 5. BARRICADE ALL CONSTRUCTION ACTIVITY FROM COMPLETED WORK AREAS. 6. COMPLETE ALL WORK IN AREA TO BE OCCUPIED, INCLUDING TRASH ENCLOSURE. 7. PROVIDE 6" - 12" WATER HARVESTING AS SHOWN ON THE PLAN. 8. ADDRESS LIGHT POLE CONFLICT WITH 4' MINIMUM SIDEWALK CLEARANCE WEST OF BLDG. #4. 9. PROVIDE BICYCLE PARKING AS SHOWN ON THE PLAN. 10. REMOVE STOCKPILES OR PROVIDE SWPPP CONTROLS AROUND EACH ONE. 11. SCHEDULE AN INTERMEDIATE GRADING INSPECTION WHEN THE REVISED PLAN IS AVAILABLE, AND AT LEAST ONE WEEK PRIOR TO INTENDED OCCUPANCY. |
|
09/04/2008 | GRADING - INTERMEDIATE | Continued | CHECKED ROOF DRAINAGE DISCHARGE THRU THE CURB AT THE H/C PARKING. CALL 740-6970 FOR INTERMEDIATE INSPECTIONS #09185 |
|
06/17/2008 | GRADING - INTERMEDIATE | Correction Required | 1. PROVIDE A COPY OF THE C.O.T. APPROVED/REVISED GRADING PLAN SHOWING ADDITIONAL INLETES AND OUTLETS TO WATER HARVEST AREAS. 2. ROUGH GRADE ALL WATER HARVEST AREAS. THESE AREAS MUST HAVE 6" DEPTH WHEN D.G. AND PLANTS ARE IN PLACE. (RECOMMEND 9" DEPTH TO ACCOMOCATE SPOILS AND D.G.) 3. VERIFY THAT ALL PAAL WIDTHS AND PARKING SPACES MEASURE OUT BEFORE PAVING. |