Permit: T07BU01729

Parcel: 11003081C

Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Permit Number - T07BU01729

Inspection Description - STORMWATER FOLLOW-UP INSP

Inspection Status - Approved

Date Description Inspector Results Comments
12/18/2008 STORMWATER FOLLOW-UP INSP Approved
10/07/2008 STORMWATER FOLLOW-UP INSP Correction Required REMOVE STOCKPILES OR PROVIDE SWPPP CONTROLS AROUND EACH ONE.
09/04/2008 STORMWATER FOLLOW-UP INSP Correction Required CLEAN UP WASHOUT AND PAVEMENT AROUND BUILDING #3. ALL WASH OUT TO OCCUR AT DESIGNATD WASHOUT AREA.
06/17/2008 STORMWATER FOLLOW-UP INSP Correction Required 1. PROVIDE WATER HARVEST AREAS AT THE NORTH AND EAST PERIMETERS AND COMPLETE STABILIZATION OF THESE AREAS.
2. COMPLETE DRAINAGE DITCH OUTLETS AT NE AND NW CORNERS OF THE SITE (SEE DETAIL L, PAGE 2) AND PROVIDE SWPPP CONTROLS.
3. NORTHWEST CORNER OF THE SITE ADJACENT TO SEWER LINE AND ALVERNON WASH. REMOVE SOIL AGAINST BOTTOM OF CHAINLINK FENCING AND RE-INSTALL STRAW WATTLE.
4. CLEAN OUT CONCRETE WASHOUT AREAS.