Inspection History: GRADING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/26/2008 | GRADING - INTERMEDIATE | Approved | FINAL PERMIT | |
| 04/08/2008 | GRADING - INTERMEDIATE | Partial Approval | NO WORK STARTED ON NEXT PHASE | |
| 03/13/2008 | GRADING - INTERMEDIATE | Partial Approval | N SIDE OF PARKING LOT NEEDS TO BE RESTABILIZED RIP RAP SHOULD BE ADDED AT GRATE |
|
| 03/06/2008 | GRADING - INTERMEDIATE | Partial Approval | RIBBON CUTTING CEREMONY WALKED SITE LANDSCAPE AREAS STABILIZED H/C SIGNS INSTALLED |
|
| 03/04/2008 | GRADING - INTERMEDIATE | Partial Approval | STRIPING CP 12 H/C PARKING SPACES 8 MISSING SIGNS 16 CLASS 1 BIKE PKG INSTALLED 6 CLASS 2 BIKE PKG NOT INSTALLED YET |
|
| 01/24/2008 | GRADING - INTERMEDIATE | Partial Approval | NO CHANGE IN SITE | |
| 01/18/2008 | GRADING - INTERMEDIATE | Partial Approval | PAVING COMPLETE EMPLOYEE PARKING AND ACCESS IS MARKED OUT WITH CAUTION TAPE |
|
| 01/11/2008 | GRADING - INTERMEDIATE | Partial Approval | PAVING WORK ALMOST COMPLETE MAGNUM PULLING DIRT BACK AT A 3:1 SLOPE AT RIP RAP PAD AT INLET TO NEW SD PIPE |
|
| 01/10/2008 | GRADING - INTERMEDIATE | Correction Required | N MOST RAMP HAS TRUNCATED DOMES INSTALLED INCORRECTLY RIP RAP AREA AT N END OF PARKING LOT NOT YET INSTALLED PLANS ARE NOT CLEAR ON RIP RAP SLOPE-I HAVE INSTRUCTED FOR A 3:1 OR FLATTER SLOPE |
|
| 11/06/2007 | GRADING - INTERMEDIATE | Not ready for Inspection | SEE PICS 2834-2851 SITE WORK HAS NOT BEEN STARTED (EXISTING SITE) PERMIT HAS NOT BEEN ISSUED-FEES STILL OUTSTANDING CONSTRUCTION MATERIALS IN PARKING AREAS LARGE AMOUNTS OF WORK TO BE DONE STILL |