Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Denied
Inspection History: GRADING - FINAL
Permit Number - T07BU01634
Inspection Description - GRADING - FINAL
Inspection Status - Denied
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/15/2009 | GRADING - FINAL | Denied | Contractor needs to 1- Stabilize all areas disturbed by construction. 2- Provide 3 to 1 slopes. 3- Address ponding a long westside. 4- Provide engineers cert. for project. 5- Re-establist drainage on north side of project. (dumps into Congress) |
|
10/30/2008 | GRADING - FINAL | Correction Required | Contractor has not address NOV. Site un-changed. | |
03/05/2008 | GRADING - FINAL | Partial Approval | Contractor needs to repair SWPPP controls and compact all material used for stormwater controls. | |
12/12/2007 | GRADING - FINAL | Partial Approval | No activity on site. | |
10/31/2007 | GRADING - FINAL | Partial Approval | No SWPPP concerns at this time | |
09/18/2007 | GRADING - FINAL | Partial Approval | Spoke to Brent on site. contractor working 2nd. stock pile. Set up meeting for Friday 9/21/07 to go over storm water plans for entire site. Contractor to start 3rd stockpile along Mission. | |
09/07/2007 | GRADING - FINAL | Partial Approval | Spoke to Brent on site, contractor needs to: 1- Provide SWPPP. 2- Sweep Congress St. (all lanes) 3- Compact on berms around stock pile. 4- Repair wattle eastside. 5- Install controls on norteast side of stock pile. Brent said work would start at 1330 hours. On friday, 9/14/07 hauling will stop. |