Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T07BU01624

Parcel: 11811011C


Addresses:

949 W SILVERLAKE RD

Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Date Description Inspector Results Comments
09/19/2008 STORMWATER FOLLOW-UP INSP Approved
05/29/2008 STORMWATER FOLLOW-UP INSP Denied Contractor must stabilize all areas disturbed by construction.
04/16/2008 STORMWATER FOLLOW-UP INSP Correction Required Issued correction notice. Contractor needs to:
1- Clean wash out around site. (noted on correction notice dated 4/14/08)
2- Install SWPPP controls. Per design. Replace/repair as-needed. (noted on correction notice dated 4/14/08)
3- Clean track out east side.
4- Stabilize south slope bank. (noted on correction notice dated 4/14/08)
Spoke to Carl site super in regards to issues. Contractor said he needed 5 days to address items. If items are not a addressed I will issue a stop work order.
04/14/2008 STORMWATER FOLLOW-UP INSP Correction Required Issued Correction Notice. Contractor needs to:
1- Clean street to the west and east.
2- Clean wash out around site.
3- Repair/replace wattle around site.
4- Stabilize south slope back.
Contractor had 2 days to address items. If items are not addressed I will issue a stop work order or a notice of violation. Spoke to Carl site super in regards to items.
12/17/2007 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to:
1- Repair construction entrance.
2- Clean wash out south side of project behind perimeter fence. (2nd notice)
3- Clean wash out spouthwest corner of project. Will issue a notice of violation for all washout violations.
Spoke to Carl site super in regards to.
12/11/2007 STORMWATER FOLLOW-UP INSP Partial Approval Contractor formed up manhole on northwest side.
12/06/2007 STORMWATER FOLLOW-UP INSP Correction Required Issued correction notice. Contractor needs to:
1- Clean wash out from site. (all)
2- Repair holes under wattle. (southside)
Contractor has 4 days to address items. If not addressed I will issue a stop work order or a notice of violation. Spoke to Carl site super in regards to.
12/03/2007 STORMWATER FOLLOW-UP INSP Partial Approval Contractor installed 8" stormsewer pipe on southwest corner of building per approved plan. Spoke to Carl site super in regards to providing SWPPP controls for property where contractor stockpiling material. If not addressed will issue a stop work order.
11/15/2007 STORMWATER FOLLOW-UP INSP Correction Required Issued correction notice. Contractor has 5 days to address:
1- Clean wash out on southside of project in drainage channel.
2- Un-cover wattle on eastside, put back in working order.
3- Install construction entrance on northside, if going to continue to use as entrance.
Spoke to Carl site super in regards to. If items are not addressed will issue a notice of violation or stop work order.
10/25/2007 STORMWATER FOLLOW-UP INSP Partial Approval Contractor needs to:
1- Clean street.
2- Re-install controls south side of project.