Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/04/2008 | STORMWATER FOLLOW-UP INSP | Approved | CONSTRUCTION COMPLETE | |
| 09/11/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | CLEAN UP AND REMOVE ALL CONCRETE RESIDUALS. | |
| 05/06/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. REMOVE DIRT STOCK PILE FROM R/D BASIN 2. PROVIDE 30' X 50' X6" DEEP ROCK FOR STABILIZED CONSTRUCTION ENTRANCE. 3. SWEEP DIRT TRACK OUT FROM TANQUE VERDE ROAD. 4. HANDICAP PARKING SPACES AND ACCESS AISLES MUST HAE NO GREATER SLOPE THAT 2% IN ALL DIRECTIONS |
|
| 04/24/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. CLEAN UP CONCRETE SPILLS NOT IN DESIGNATED WASHOUT AREA. 2. CLOSE THE GAP BETWEEN THE R/D BERM AND THE RETAINING WALL AT SW CORNER OF BASIN. |