Permit: T07BU01593

Parcel: 11449027A

Inspection Status: Not ready for Inspection

Inspection History: STORMWATER INSTALL OF CONTROLS

Date Description Inspector Results Comments
03/10/2008 STORMWATER INSTALL OF CONTROLS Not ready for Inspection CANCELED BY NORM
03/10/2008 STORMWATER INSTALL OF CONTROLS Approved STRAW BALE INSTALLATION WILL BE MONITORED
02/26/2008 STORMWATER INSTALL OF CONTROLS Partial Approval 1. COMPLETE THE STABILIZED CONSTRUCTION ENTRANCES.
2. POST THE AZPDES AUTHORIZATION.
3. CONSTRUCT THE CONCRETE WASH OUT AREA.
4. PROVIDE STRAW BALES AT THE SW CORNER OF SITW.