Inspection Status: Not ready for Inspection
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/10/2008 | STORMWATER INSTALL OF CONTROLS | Not ready for Inspection | CANCELED BY NORM | |
| 03/10/2008 | STORMWATER INSTALL OF CONTROLS | Approved | STRAW BALE INSTALLATION WILL BE MONITORED | |
| 02/26/2008 | STORMWATER INSTALL OF CONTROLS | Partial Approval | 1. COMPLETE THE STABILIZED CONSTRUCTION ENTRANCES. 2. POST THE AZPDES AUTHORIZATION. 3. CONSTRUCT THE CONCRETE WASH OUT AREA. 4. PROVIDE STRAW BALES AT THE SW CORNER OF SITW. |