Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/07/2008 | STORMWATER INSTALL OF CONTROLS | Approved | ||
| 01/23/2008 | STORMWATER INSTALL OF CONTROLS | Correction Required | 1) SWEEP PARKING LOT AND AREA AROUND PERIMETER, MORE EFFORT NEEDED TO KEEP SOIL ON SITE. 2) ENSURE A CONCRETE/MATERIALS WASH OUT IS INSTALLED AND USED. 3) ENSURE THAT WATER ACCEPTED ON SITE AT SE CORNER, IS CONTROLED AND KEPT ON SITE OR NOT ACCEPTED. 4) PLACE BMP'S AROUND STOCKPILE LOCATED ON SW CORNER OF SITE. |