Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/03/2008 | ENGINEERING PRE-CONSTRUCTION | Approved | 1) INSTALL BMP'S PER SWPPP. 2) INSTALL ROCK ENTRANCE AND MAINTAIN T THROUGHOUT THE PROJECT. 3) PROVIDE A DESIGNATED CONCRETE/MATERIALS WASH OUT ON SITE. 4) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS REQUIRED UNDER YOUR SWPPP. 5) POST A COPY OF YOUR SIGNED NOI AT ENTRANCE TO SITE. 6) ROUTINELY SWEEP UP TRACKED MATERIAL OFF OF PARKING AREA AND PUBLIC ROADWAYS. |
|
| 12/11/2007 | ENGINEERING PRE-CONSTRUCTION | Not ready for Inspection | NO ACTIVITY |