Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/18/2010 | ENGINEERING PRE-CONSTRUCTION | Approved | Entry 09/08/2010 - slope stability required. This geotech document received in September, 2010. Entry 09/08/2010 (keyA003417277) deleted since it would not update in P+. - EL | |
| 08/20/2010 | ENGINEERING PRE-CONSTRUCTION | Approved | ||
| 06/16/2010 | ENGINEERING PRE-CONSTRUCTION | Continued | WORK CONTINUES. SUB-CONTRACTOR WORKING ON THE GROUTED RORK-RIP RAP ON REAR SLOPE. | |
| 03/10/2010 | ENGINEERING PRE-CONSTRUCTION | Continued | 3007 W VIA DE SUENOS Landscaping and Engineering took a look at the proposed shift in location for the septic equipment for Rudy Garcia's project. Engineering has no issue with this change being reflected on the as-built Final Revised Grading Plan submittal. He also talked to Andy in Landscaping who will need a NPPO workflow after they submit the as-builts. I let Rudy know that he'd need to contact PCWW for any of their requirements - he stated that he already had. I added a REVISION Tier 1 comment in Inspections, and Comment/Notices for fyi. Elizabeth |
|
| 03/08/2010 | ENGINEERING PRE-CONSTRUCTION | Continued | SITE VISIT. SPOKE WITH SUPER. AGAIN REGARDING THE STABILIZATION OF SIDE SLOPES. | |
| 01/25/2010 | ENGINEERING PRE-CONSTRUCTION | Correction Required | MR GARCIA RETURNED MY CALL STATING HE HAD RECIEVED MY MESSAGE AND THAT HE WOULD WORK WITH HIS CONTRACTOR TO CORRECT THE PROBLEM PER HIS CONDITIONS LIST. | |
| 01/19/2010 | ENGINEERING PRE-CONSTRUCTION | Correction Required | MR. GARCIA LEFT MESSAGE ACKNOWLEDING RECEIPT OF MY LAST INSPECTION CALLING FOR EROSION PROTECTION TO HAVE HAND PLACED RIP RAP WITH FILTER FABRIC. MR GARCIA WILL WORK WITH HIS CONTRACTOR TO CORRECT SITUATION ON EXISTING SLOPE AT DRIVEWAY DRAINING TO ROADWAY. | |
| 01/08/2010 | ENGINEERING PRE-CONSTRUCTION | Correction Required | SPOKE WITH SITE SUPER. INFORMED HIM THAT PER CONDITIONS OF THE PERMIT ALL SLOPES NEED TO HAVE HAND PLACED ROCK RIP RAP WITH FILTER FABRIC. THE ROCK RIP RAP PLACE ON THE SLOPE ADJACENT TO THE ROAD DOES NOT HAVE FILTER FABRIC. THE SLOPE WILL NEED TO BE REDONE TO INCLUDE FILTER FABRIC. |