Permit: T07BU01542

Parcel: 132166420


Addresses:

817 E OHIO ST


Inspection Status: Approved

Inspection History: GRADING - INTERMEDIATE

Permit Number - T07BU01542

Inspection Description - GRADING - INTERMEDIATE

Inspection Status - Approved

Date Description Inspector Results Comments
04/09/2010 GRADING - INTERMEDIATE Approved
01/19/2010 GRADING - INTERMEDIATE Continued WORK CONTINUES ON SITE. CORRECTIONS ARE BEING MADE TO ADD HEADER WALL AND BOLLARDS ON W/S OF PARKING LOT. PEDESTRIAN PATHS HAVE BEEN PAINTED. ROCK-RIP-RAP IS COMPLETE AT BASIN OUTLET. LANDSCAPING AND SITE STABILIZATION ARE IN PROGRESS. H/C SIGNAGE IS BEING WORKED ON.
01/13/2010 GRADING - INTERMEDIATE Correction Required Preliminary Punch List

The following is a preliminary list of items that need to be addressed prior to site completion.

Contractor needs to complete all site work per approved plan.

1) Per note 4 on the approved plans-concrete header opening with post barricade is necessary in both indicated locations. (Per standard detail#106)
2) Install bicycle parking per approved plan note #6
3) Per note 9 install H/C parking signs per plan
4) Per note 10, install concrete parking bumpers
5) Per note 11 install barricade railing
6) Per note 12 install 5' painted pedestrian path in both locations indicated
7) Per notes 15 and 24-Provide revised set of plans or letter from engineer indicating approval of the elimination of these items.
8) Per note 29, items have not been completed. Provide revised set of plans or letter from engineer indicating approval of the elimination of these items.
9) Complete basin structure per plan including installation of rock rip rap. Basin certification letter from registered engineer is necessary before completion of project.
10) Remove all construction debris and stock piles.
11) Per notes on plan "scrape, clean and hydro-seed indicated areas per approved landscaping plan"
12) Stabilize all areas disturbed by construction,
13) Complete all landscaping items per approved plan.
14) Provide as-builts where necessary
15) Provide site certification letter from engineer.

Please call if you have any questions or need clarification. M. Carreon 240-9971
01/05/2010 GRADING - INTERMEDIATE Continued CALLED OUT FOR COURTESY INSPECTION THAT WAS LATER CANCELLED.
12/04/2009 GRADING - INTERMEDIATE Continued MET WITH ART HILL ON SITE.
12/02/2009 GRADING - INTERMEDIATE Continued SPOKE WITH ART HILL REGARDING PREPARATION FOR PAVING OF PARKING LOT. THEY ARE SHOOTING GRADES AND PROVIDING SURVEY INFO FOR DRAINAGE. PAVING TO BEGIN NEXT WEEK.
11/30/2009 GRADING - INTERMEDIATE Continued CHECKED REMAINING SIDEWALK FRAMES.
11/17/2009 GRADING - INTERMEDIATE Continued SIDEWALK INSPECTION FOR SIDEWALK AREAS ON PROPERTY SURROUNDING EDUCATION BLDG.
09/09/2009 GRADING - INTERMEDIATE Approved STOPPED BY TO CHECK STORMWATER CONTROLS AND BASIN CONDITION. BOTH WORKING FINE.
08/06/2009 GRADING - INTERMEDIATE Not Applicable MET GARY ON SITE TO INSPECT FENCING AROUND BASIN ON THE WEST SIDE OF PROPERTY.
07/21/2009 GRADING - INTERMEDIATE Correction Required SITE NOT ACTIVE AT THIS TIME. PREVIOUS COMMENTS STILL NEED TO BE ADDRESSED.
03/11/2009 GRADING - INTERMEDIATE Continued I INFORMED GARY 370-6357 THAT GRADE MUST MATCH EXISTING GRADE 2' INSIDE THE PROPERTY AND THAT POSITIVE DRAINAGE MUST BE MAINTAINED AT THE PERIMETER OF THE SITE.