Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date |
Description |
Inspector |
Results |
Comments |
| 11/19/2009 |
STORMWATER INSTALL OF CONTROLS |
|
Approved |
NO CONCERNS AT THIS TIME. |
| 07/28/2009 |
STORMWATER INSTALL OF CONTROLS |
|
Approved |
WALKED SITE WITH GARY, SITE CONTACT, (370-6357). STORMWATER CONTROLS HAVE BEEN REPLACED WITH SCREEN WALL AROUND ENTIRE PROPERTY. DRAINAGE STRUCTURE ALMOST COMPLETE. |
| 03/17/2009 |
STORMWATER INSTALL OF CONTROLS |
|
Approved |
All SWPPP controls installed. |
| 03/11/2009 |
STORMWATER INSTALL OF CONTROLS |
|
Denied |
SWPPP CONTROLS MUST PROVIDE SEDIMENT AND EROSION CONTROL. PROVIDE ADDITIONAL BMP'S AT SITE PERIMETER |