Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/31/2009 | GRADING - FINAL | Approved | ||
| 04/29/2009 | GRADING - FINAL | Correction Required | SPOKE WITH SUPERINTENDENT/OWNER - NEED TO COMPLETE ALL HC PARKING AND ACCESS PER THE APPROVED PLAN PRIOR TO APPROVAL FOR TEMP C OF O FOR ENGINEERING. PROVIDE A REVISED/APPROVED PLAN SHOWING WHAT WAS BUILT OR BUILD THE SITE PER THE APPROVED GRADING PLAN. |
|
| 04/21/2009 | GRADING - FINAL | Denied | 1) INSTALL HC SIGN PER YOUR APPROVED SITE/GRADING PLAN - SEE DETAIL#4 ON SD1. 2) INSTALL TRUNCATED DOME STRIP (2' X 20') ALONG HC PARKING LOADING AREA - SEE DETAIL #5 ON SD1. 3) INSTALL EXTRUDED CURB ALONG NORTH SIDE OF PARKING AREA W/ CURB OPENINGS @ 10' OC - SEE NOTE#10 ON SD1. 4) INSTALL BICYCLE PARKING PER PLAN - SEE DETAIL #3 ON SD1 AND NOTE #13. 5) INSTALL 30" SCREEN/CMU WALL SEE NOTES #29/30 ON APPROVED PLAN. |