Inspection History Details
Inspection Status: Continued
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/20/2010 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME. | |
| 01/28/2010 | STORMWATER FOLLOW-UP INSP | Continued | MINOR TRACK OUT NEEDS TO BE CLEANED | |
| 07/21/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | CHECKED THE SITE FOR ACTIVITY TO SEE WHAT HAS BEEN HAPPENING SINCE I LAST LOOKED AT THE SITE. THE SITE APPEARS TO BE OKAY AT THIS TIME BUT HAS SOME MINOR TRACKOUT ALONG THE DRIVEWAY ENTRANCE INTO THE SITE. HAVE ADVISED THE ONSITE PERSONNEL THAT THIS AREA NEEDS TO BE ADDRESSED AS SOON AS POSSIBLE. | |
| 03/24/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS CONTROLS IN PLACE AND BEING MAINTAINED |
|
| 01/06/2009 | STORMWATER FOLLOW-UP INSP | Correction Required | NO CHANGE IN SITE SENT 2ND CORRECTION NOTICE |
|
| 12/02/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | PERFORM MAINTENANCE ON SWPPP CONTROLS SWEEP UP TRACK OUT CONTAIN ALL CONSTRUCTION MATERIAL/DEBRIS |
|
| 10/28/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS | |
| 07/24/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTION NOTICE 5 DAYS -REMOVE DIRT FORM SIDEWALK AREA -CONTAIN ALL CONSTRUCTION DEBRIS -POST AZPDES AND SWPPP INFO -SWEEP ROADWAY |
|
| 07/08/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | SITE IS GOING VERTICAL TRACK OUT NEEDS TO BE SWEPT |
|
| 05/30/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | SAND BAGS STILL NOT PLACED STREET STILL NEEDS TO BE SWEPT |
|
| 05/19/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | TRACK OUT ON STREET POSTINGS NOT COMPLETE OR IN PLACE WATTLE AT DROP INLET/SCUPPER NOT PER BMPS |