Inspection History Details
Inspection Status: Continued
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/15/2010 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME. | |
| 06/23/2010 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME, MISSING SIDEWALK, DRIVEWAY, AND AC PAVEMENT AT THIS TIME. ROUGH CONSTRUCTION OF THE BUILDING IS COMPLETE. | |
| 09/21/2009 | STORMWATER FOLLOW-UP INSP | Correction Required | Minor cleanup at sidewalk & roadway, cleanup sediment in drainage way as needed. | |
| 03/24/2009 | STORMWATER FOLLOW-UP INSP | Prior to 1010/1015 | NO CONCERNS CONTROLS IN PLACE AND BEING MAINTAINED |
|
| 02/19/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS AT THIS TIME MAINTENANCE WORK IS BEING PERFORMED REGULARLY BY CHRIS |
|
| 01/28/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | CP-AZPDES INFORMATION TO BE POSTED FOR EACH LOT UNK-SWPPP LOG BOOK TO BE UPDATED PA-GENERAL HOUSEKEEPING TO BE ADDRESSED |
|
| 01/14/2009 | STORMWATER FOLLOW-UP INSP | Correction Required | MET WITH CHRIS GUINTER 940-0563 CORRECTION REQUIRED 10 DAY FOLLOW UP ITEMS TO BE ADDRESSED: -AZPDES INFORMATION TO BE POSTED FOR EACH LOT -SWPPP LOG BOOK TO BE UPDATED -GENERAL HOUSEKEEPING TO BE ADDRESSED |
|
| 01/06/2009 | STORMWATER FOLLOW-UP INSP | Correction Required | NO CHANGE IN SITE 2ND CORRECTION NOTICE SENT |
|
| 12/02/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | PERFORM MAINTENANCE ON SWPPP CONTROLS SWEEP UP TRACK OUT CONTAIN ALL CONSTRUCTION MATERIAL/DEBRIS |
|
| 10/28/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | PERFORM MAINTENANCE ON CONTROLS AT SCUPPER INLET | |
| 07/24/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTION NOTICE 5 DAYS -REMOVE DIRT/STOCKPILE FROM SIDEWALK -SWEEP UP TRACK OUT -PERFORM MAINTENANCE ON SCE -CONTAIN ALL CONSTRUCTION DEBRIS -POST AZPDES AND SWPPP INFO |
|
| 07/08/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | BUILDING COMPLETE TRACK OUT NEEDS TO BE SWEPT |
|
| 05/30/2008 | STORMWATER FOLLOW-UP INSP | Continued | SAND BAGS STILL NOT PLACED STREET STILL NEEDS TO BE SWEPT |
|
| 05/19/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | TRACK OUT ON STREET POSTINGS NOT COMPLETE OR IN PLACE WATTLE AT DROP INLET/SCUPPER NOT PER BMPS |