Inspection History Details
Inspection Status: Continued
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/20/2010 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME. | |
| 12/15/2010 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME. | |
| 07/27/2010 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS | |
| 07/22/2010 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS | |
| 07/14/2010 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS | |
| 06/24/2010 | STORMWATER FOLLOW-UP INSP | Correction Required | GENERAL CLEANUP OF THE SIDEWALKS AND ROADWAYS, NO OTHER CONCERNS. | |
| 09/21/2009 | STORMWATER FOLLOW-UP INSP | Correction Required | Minor cleanup at sidewalk and roadways, check channel for minor erosion and sediment from edge of site due to lack of controls | |
| 03/24/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS CONTROLS IN PLACE AND BEING MAINTAINED |
|
| 03/06/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. THE MAJORITY OF THE SITE IS COMPLETED AND HAS BEEN STABILIZED. | |
| 02/19/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS AT THIS TIME MAINTENANCE WORK IS BEING PERFORMED REGULARLY BY CHRIS |
|
| 01/28/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | CP-AZPDES INFORMATION TO BE POSTED FOR EACH LOT UNK-SWPPP LOG BOOK TO BE UPDATED PA-GENERAL HOUSEKEEPING TO BE ADDRESSED |
|
| 01/14/2009 | STORMWATER FOLLOW-UP INSP | Correction Required | MET WITH CHRIS GUINTER 940-0563 CORRECTION REQUIRED 10 DAY FOLLOW UP ITEMS TO BE ADDRESSED: -AZPDES INFORMATION TO BE POSTED FOR EACH LOT -SWPPP LOG BOOK TO BE UPDATED -GENERAL HOUSEKEEPING TO BE ADDRESSED |
|
| 01/06/2009 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTION NOTICE 5 DAYS SWEEP UP TRACK OUT PERFORM MAINTENANCE ON SCE PERFORM MAINTENANCE ON SEDIMENT CONTROLS AT SCUPPER LOCATIONS |
|
| 12/02/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | PERFORM MAINTENANCE ON SWPPP CONTROLS SWEEP UP TRACK OUT CONTAIN ALL CONSTRUCTION MATERIAL/DEBRIS |
|
| 10/28/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | PERFORM MAINTENANCE ON SWPPP CONTROLS SWEEP STREET |
|
| 07/24/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | PERFORM MAINTENANCE ON BMPS AT DRAINAGE INLETS | |
| 07/08/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | PAD BLUE TOPPED AND PLUMBING INSTALLED TRACK OUT NEEDS TO BE SWEPT |
|
| 05/30/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | SAND BAGS STILL NOT PLACED STREET STILL NEEDS TO BE SWEPT |
|
| 05/21/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | SANDBAGS HAVE NOT BEEN PLACED AT WATTLE AT INLETS TRACK OUT STOCKPILES OUTSIDE OF GRADING LIMITS |
|
| 05/19/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | TRACK OUT ON STREET POSTINGS NOT COMPLETE OR IN PLACE WATTLE AT DROP INLET/SCUPPER NOT PER BMPS |
|
| 05/07/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | V-DITCH INSTALLED |