Permit: T07BU01161

Parcel: 11621373C

Inspection Status: Closed

Inspection History: GRADING - FINAL

Permit Number - T07BU01161

Inspection Description - GRADING - FINAL

Inspection Status - Closed

Date Description Inspector Results Comments
05/05/2020 GRADING - FINAL Closed SITE HAS NOT BEEN CONSTRUCTED PER THE APPROVED PLANS AND THIS PERMIT INSPECTION IS CLOSED AT THIS TIME. PLANS HAVE BEEN DESTROYED
05/05/2017 GRADING - FINAL Not ready for Inspection NO MESSAGE NO ONE ON SITE.
06/07/2011 GRADING - FINAL Continued NO ACTIVITY AT THIS TIME.
05/06/2011 GRADING - FINAL Continued NO ACTIVITY.
03/24/2011 GRADING - FINAL Continued NO ACTIVITY.
03/08/2010 GRADING - FINAL Continued CONSTRUCTION FENCING HAS BLOWN DOWN CAUSING A HAZZARD IN RIGHT-OF-WAY. FENCING NEEDS TO BE FIXED.
01/20/2010 GRADING - FINAL Continued MET WITH JIM FEMLING AND DAVID ROBERTS TO DISCUSS STATUS OF PROJECT. IT WAS DECIDED THAT CONTRACTOR NEEDS TO PROVIDE AS-BUILTS FOR THE PROJECT AND REQUEST A FINAL INSPECTION TO DETERMINE THE STATUS OF THE PROJECT. LEFT MESSAGE WITH DAVID FROM EAGLE ROCK EXPLAINING THE PROCESS.
01/07/2009 GRADING - FINAL Correction Required Contractor needs to keep wattle in working order and pick up trash from around site. Spoke to Jose new site super.
03/28/2008 GRADING - FINAL Not ready for Inspection Contractor provided letter from surveyor with basis of elevation.
03/25/2008 GRADING - FINAL Not ready for Inspection Met with Randy onsite went over grading plan and survey stake out. Randy provided cut sheets for inspection. Went over stake out for buildings 4, 5 and 6. Contractor will need to provide letter from surveyor with basis of elevation. Contractor will need to provide approved grading plan for site. Contractor using set of drawings that are not approved.
03/21/2008 GRADING - FINAL Not ready for Inspection Compared approved plans with survey stake out. Contractor needs to address problem found.