Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/24/2008 | ENGINEERING PRE-CONSTRUCTION | Approved | MET WITH SUPER APPROXIMATELY 2 MONTHS AGO AND DISCUSSED PROJECT - NO SWPP FOR PROJECT; HOWEVER MAY NEED TO ADD SEDIMENT CONTROLS AT THE PERIMETER TO ENSURE DISTURBED SOIL STAYS ON SITE. | |
| 04/01/2008 | ENGINEERING PRE-CONSTRUCTION | Not ready for Inspection | NO ACTIVITY | |
| 03/07/2008 | ENGINEERING PRE-CONSTRUCTION | Partial Approval | NO CONSTRUCTION ACTIVITY ON SITE NO STORM WATER CONCERNS |
|
| 02/13/2008 | ENGINEERING PRE-CONSTRUCTION | Approved | NO STORM WATER PLAN REQUIRED FOR SITE, DISTURBANCE IS < 1.0 AC. PROTECT EXISTING STORM WATER 36" CMP DURING CONSTRUCTION. SWEEP UP ANY TRACKING ASSOCIATED WITH CONSTRUCTION AS NEEDED. PROVIDE A DESIGNATED CONCRETE WASH OUT. CALL FOR RE-INSPECTION IF YOU HAVE ANY CHANGES OR CONCERNS. |
|
| 01/23/2008 | ENGINEERING PRE-CONSTRUCTION | Not ready for Inspection | NO ACTIVITY |