Inspection History Details
Inspection Status: Correction Required
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/29/2009 | GRADING - FINAL | Correction Required | SENT EXPIRED GRADING LETTER SEE SIRE | |
| 08/12/2008 | GRADING - FINAL | Not ready for Inspection | WORK ON BASIN COMPLETED PER CONTRACTOR BASIN CERT ON IT'S WAY NOT SURE IF WORK ADDRESSED STANDING WATER ISSUES IN BASIN-NO STANDING WATER AT THIS TIME |
|
| 07/22/2008 | GRADING - FINAL | Not ready for Inspection | -BASIN CERTIFICATION LETTER NEEDED FROM EOR -SPLASH BLOCKS NEEDED -ADDRESS BASIN HOLDING WATER-ENSURE BASIN DRAINS WITHIN 24 HOURS PER DETENTION/RETENTION MANUAL RQMTS -VERIFY WSE IS < 24" OR INSTALL SECURITY BARRIER PER DETENTION/RETENTION MANUAL REQMTS |