Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
Permit Number - T07BU00812
Inspection Description - STORMWATER INSTALL OF CONTROLS
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/21/2007 | STORMWATER INSTALL OF CONTROLS | Approved | CONTRACTOR REPORTED THAT STORMWATER RUN-OFF HAS BEEN CONTAINED ON SITE DURING THE LAST COUPLE RAIN EVENTS. | |
08/02/2007 | STORMWATER INSTALL OF CONTROLS | Partial Approval | PARTIAL APPROVAL BECAUSE OF IMPROPER EXCAVATION FOR SILT FENCE INSTALLATION. DAVE 314-703-7837 WILL MONITOR SWPP CONTROLS AND DETERMINE CORRECTIONS. | |
08/01/2007 | STORMWATER INSTALL OF CONTROLS | Denied | CORRECTION NOTICE STOP WORK ORDER IS EMINENT IF SWPP CONTROLS ARE NOT IN PLACE BEFORE AFTERNOON RAIN STORM. I HAD A TELEPHONE CONVERSTION WITH BRUCE OF DARHILL CONSTRUCTION ( 730-0149) REGARDING THE CORRECT INSTALLATION OF SWPPP CONTROLS. 1. PROVIDE STABILIZED CONSTRUCTION ENTRANCE WITH 1 -3" ROCK 30' X 50' X 3" DEEP TO PREVENT SOIL TRACK-OUT. 2. REPAIR BREECHES IN SILT FENCE AND CORRECT UNDERMINING CONDITIONS. 3. INSTALL STRAW BALES AT CONCENTRATION POINTS. KEY INTO GROUND A MINIMUM OF 6" AND STAKE. ( A HAND WRITTEN DRAWING/DETAIL WAS PROVIDED THAT SHOWED THE STRAW BALES DEPRESSED LOWER THAN THE SILT FENCE TO PROVIDE A STRAW BALE WEIR OUTFALL. I CALLED DAVE THE SUPERINTENDENT AT 3:00 PM, HE TOLD ME THAT DARHILL WAS ON SITE MAKING THE REQUIRED CORRECTIONS. |
|
07/30/2007 | STORMWATER INSTALL OF CONTROLS | Correction Required | CORRECTION ORDER ISSUED FOR 24 HOUR COMPLIANCE OR A NOV, CITATIONS AND STOP WORK ORDER WILL BE ISSUED. 1. BURY SILT FENCE 6" TO RED LINE AT PERIMETER OF SITE. 2. COMPACT SOIL ON BOTH SIDES OF SILT FENCE, MATCH EXISTING GRADE AT OUTSIDE PERIMETER./ 3. PROVIDE STRAW BALES AT OUTFALL/CONCENTRATION POINT. |
|
07/25/2007 | STORMWATER INSTALL OF CONTROLS | Correction Required | 1. COMPACT SOIL BACKFILL AT SILT FENCE(BOTH SIDES). 2. STRAIGHTEN UP ALL SILT FENCE, REPAIR ALL BROKEN STAKES AND MISSING STAPLES. PROVIDE UNIFORM APPEARANCE AND BURY TO 6" LINE AT THE BOTTOM. 3. MATCH EXISTING GRADE OUTSIDE OF SILT FENCE PERIMETER AND REMOVE BRUSH DESTROYED IN GRUBBING PROCESS. 4. PROVIDE STRAW BALES AT OUTFALL/CONCENTRATION POINT |