Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T07BU00794
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/18/2008 | STORMWATER FOLLOW-UP INSP | Approved | All areas stabilized. | |
04/18/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor addressed otems from correction notice. Need to Mario on site and look at grading rear of building. | |
04/15/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | Issued correction notice. Contractor had 2 daqys to address: 1- Clean up wash out around site. 2- Install controls per SWPPP. 3- Cold patch all utility cuts. 4- Sweep south loading/parking area. 5- Wet area down for dust controls. 6- Install safety barrier around all equipment outside construction limits. Spoke to Mario site super in regards to issues. If items are not addressed I will issue a stop work order. |
|
04/01/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to sweep rear of building behind fence. Track out. | |
12/27/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to: 1- Sweep northwest side of project. 2- Install controls around catch basin on northwest corner of project. Spoke to site super in regards to. |
|
12/10/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to keep travel lanes clean. | |
11/19/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Issued correction notice. Contractor needs to addrerss: 1- Replace wattle broken apart. 2- Clean up wash out around site. 3- Install wattle where needed. 4- Address discharge. Spoke to site super in regards to. Contractor has 14 days to address items. If items are not addressed will issue a notice of violation. |
|
10/05/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor addressed correction notice dated 10/3/07. | |
10/03/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Issued Correction Notice. Contractor has 2 days to: 1- Sweep parking area. 2- Replace wattle as needed. 3- Place sand bags on wattle. 4- Clean wash out around site. 5- Install a working wash out area. If items are not addressed I will issue Notice of Violation. Gave contractor copy of new re-fee policy. |
|
08/23/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to: 1- Add controls to the northeast corner. Silt running off site. 2- Un-cover wattle on north side of project. 3- Install controls on west side per detail drawing. Spoke to site super in regards to issues. |
|
08/06/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Silt running off north east side of project. Contractor needs to add controls to stop discharge. | |
08/02/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to add controls to the northeast side of the project. |