Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - INTERMEDIATE
Permit Number - T07BU00756
Inspection Description - GRADING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/12/2009 | GRADING - INTERMEDIATE | Approved | 2 COPIES OF LETTER RECVD 1. PROVIDE ENGINEER CERTIFICATION LETTER SEE NOTE 12 PAVING AND GRADING PLAN STAMPED BLUE LINE PROVIDED BY CHRIS 2. PROVIDE A C.O.T. APPROVED AS-BUILT GRADING PLAN. AP 3/5/9 BY PAUL M 3. RECONSTRUCT DRAINAGE DISCHARGE OUTFALL AT NORTH PERIMETER TO APPROVED DETAIL "G" SPECIFICATIONS, AND REMOVE MATERIALS FROM 10' BUFFER YARD. SEE DETAIL M/4 4. PROVIDE HAND PLACED ROCK RIP RAP ON FILTER FABRIC FOR SLOPES THAT EXCEED 3:1 ON OUTSIDE PERIMETER OF SITE. SEE DETAIL L AND M ON 4 5. PROVIDE A CROSS SECTION DETAIL FOR SLOPE CONSTRUCTION AT THE PERIMETER ON THE AS-BUILT PAVING AND GRADING PLAN. CP 6. CLEAN UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS INCLUDING GRAVEL IN THE DRAINAGEWAY |
|
02/20/2009 | GRADING - INTERMEDIATE | Denied | 1. PROVIDE ENGINEER CERTIFICATION LETTER SEE NOTE 12 PAVING AND GRADING PLAN 2. PROVIDE A C.O.T. APPROVED AS-BUILT GRADING PLAN. 3. RECONSTRUCT DRAINAGE DISCHARGE OUTFALL AT NORTH PERIMETER TO APPROVED DETAIL "G" SPECIFICATIONS, AND REMOVE MATERIALS FROM 10' BUFFER YARD. 4. PROVIDE HAND PLACED ROCK RIP RAP ON FILTER FABRIC FOR SLOPES THAT EXCEED 3:1 ON OUTSIDE PERIMETER OF SITE. 5. PROVIDE A CROSS SECTION DETAIL FOR SLOPE CONSTRUCTION AT THE PERIMETER ON THE AS-BUILT PAVING AND GRADING PLAN. 6. CLEAN UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS INCLUDING GRAVEL IN THE DRAINAGEWAY |
|
02/09/2009 | GRADING - INTERMEDIATE | Continued | (15) ENGINEERING APPROVAL FOR C OF O WERE CALLED IN FOR TODAY. I MET WITH CHRIS GUINTER, I INFORMED HIM THAT THE FINAL GRADING INSPECTION HAD TO BE COMPLETED AND APPROVED PRIOR TO APPROVAL FOR C OF O. SEE ATTACHED LETTERS BELOW: Chris, Engineering Approval for the Building Permits can not be given until the Final Grading Inspection (#09190) is completed and approved for Permit T07BU00756. Provide a letter of certification from the Arizona Registered P.E. for Completion of Work (per City of Tucson Development Standard 11-01.16.0). Provide a copy of the C.O.T. approved As-Built Grading Plan. Let me know if you have any questions or concerns. Thank you John Bruckmeier 520-419-2466 John, This was an oversight on Engineering's part when it came in for the revision. I did not notice the change from 25-feet to 22-feet. Considering the development (self storage that will have limited access) and the fact that Fire still has access, we will approve this design for this project only. Thee 22-foot PAAL width at the entry gate location is approvable. Regards, JG Jason Green, CFM Senior Engineer Associate Engineering Division COT Development Services *Phone: (520) 837-4929 Jason.Green@tucsonaz.gov >>> John Bruckmeier 02/09/2009 10:31 AM >>> Jason, A-Atlas Discount Storage at 9685 E. Broadway has an approved plan revision dated 12-23-08. The approved revision included a 25' sliding gate that was reduced to a 22' sliding gate at the entrance to the storage facility. This gate reduces the driveway entrance to 22' width. The gate has already been constructed. Please advise. Thank you John Bruckmeier |
|
01/26/2009 | GRADING - INTERMEDIATE | Correction Required | 1. HANDICAP PARKING SPACE MUST HAVE SLOPES OF LESS THAN 2% IN ALL DIRECTIONS. 2. EXTEND SIDEWALK AND CURB TO THE PROPERTY LINE. 3. OK TO POUR SIDEWALKS SLOPE AND WIDTHS ARE GOOD |
|
10/15/2008 | GRADING - INTERMEDIATE | Correction Required | I MET CHRIS ON SITE GRADING AND CONSTRUCTION AT THIS SITE DOES NOT CONFORM TO THE APPROVED GRADING PLANS |
|
09/22/2008 | GRADING - INTERMEDIATE | Continued | ROCK RIP RAP OUTFALLS WILL BE INSTALLED THIS WEEK. | |
04/28/2008 | GRADING - INTERMEDIATE | Partial Approval | EXCESS SOIL HAS BEEN REMOVED FROM WEST PERIMETER, SLOPE STILL REQUIRES DRESS UP AND VERIFY 3:1 SLOPE FOR FINAL GRADE. | |
04/15/2008 | GRADING - INTERMEDIATE | Continued | CHRIS IS REMOVING OVERBUILD ON WEST PERIMETER AND WILL TRY TO ACHIEVE A 3:1 SLOPE. | |
04/14/2008 | GRADING - INTERMEDIATE | Continued | OVERBUILD ON WEST PERIMETER NEEDS TO BE CORRECTED AND SLOPE COMPACTED. | |
01/10/2008 | GRADING - INTERMEDIATE | Correction Required | SITE GRADING IS 1' LOWER FOR 3 BUILDINGS ON THE PERIMETER, AND 6" LOWER FOR BUILDINGS WITHIN THE SITE. I PHONED JEFF STANLEY TO INFORM HIM THAT THESE ELEVATIONS NEED TO BE SHOWN ON THE APPROVED GRADING PLANS. |