Inspection Status: Approved
Inspection History: GRADING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/27/2008 | GRADING - INTERMEDIATE | Approved | ||
| 04/21/2008 | GRADING - INTERMEDIATE | Correction Required | MET WITH SUPERINTENDENT TO DISCUSS ADA PEDESTRIAN CROSSING. OK TO BUILD CROSSING AND VARY FROM APPROVED PLAN, NO NEED FOR THREE HC RAMPS AT EACH SIDE OF CROSSING, AS LONG AS PEDESTRIAN PATHWAY MEETS ADA REQUIREMENTS. | |
| 03/13/2008 | GRADING - INTERMEDIATE | Correction Required | MET WITH SUPERINTENDENT TO DISCUSS SITE WORK. 6" WATER HARVESTING ALONG NORTH SIDE. 10' WEIR ALONG NORTH WALL ENSURE SITE WORK COMPLETED PRIOR TO FINAL APPOVAL |
|
| 05/16/2007 | GRADING - INTERMEDIATE | Correction Required | SITE WORK BEING ACCOMPLISHED. CONTRACTOR IS REMOVING SOIL FROM OUTSIDE OF GRADING LIMIT AND DROPING THE OVERALL GRADE OF THE SITE TO THE PROPER EVELATION. NO STORM WATER CONCERNS AT THIS TIME. WILL RE-INSPECT. | |
| 04/26/2007 | GRADING - INTERMEDIATE | Correction Required | 1) RE-ESTABLISH A DEFINED GRADING LIMIT AS SHOWN ON YOUR APPROVED GRADING PLAN AND BRING MATERIAL BACK WITHIN THAT LIMIT. 2) SWEEP UP ANY TRACKED MATERIAL OFF OF PUBLIC ROADWAY. 3) ENSURE CONCRETE AND CONSTRUCTION MATERIALS ARE CONTAINED ON SITE AND DISPOSED OF PROPERLY. |
|
| 04/25/2007 | GRADING - INTERMEDIATE | Correction Required | CONTACTED OWNER/SUPERINTENDENT, DISCUSSED GRADING PLAN AND ON SITE GRADING. WALKED SITE, IT APPEARS GRADING HAS BEEN DONE OUTSIDE THE GRADING LIMIT. SCHEDULED INSPECTION FOR 4/26/07 DANIEL MONTANO 241-0185 |
|
| 04/17/2007 | GRADING - INTERMEDIATE | Correction Required | 1) SITE HAS BEEN GRADED 2) FILL HAS BEEN BROUGHT ON SITE 3) RE-ESTABLISH A DEFINED GRADING LIMIT, AND BRING MATERIAL BACK WITHIN THAT LIMIT. NO ACTIVITY ON SITE, NO CONTACT INFO AVAILABLE. WILL RE-SCHEDULE AN INSPECTION SITE IS .84 ACRES NO SWPPP REQUIRED |