Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: GRADING - FINAL
Permit Number - T07BU00752
Inspection Description - GRADING - FINAL
Inspection Status - Not ready for Inspection
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/21/2020 | GRADING - FINAL | Not ready for Inspection | FOR A FULL RELEASE THIS SITE IS NOT READY AT THIS TIME, COMPLETE THE SITE AS SHOWN ON THE APPROVED PLANS OR PROVIDE THIS DEPARTMENT WITH THE APPROVED REVISED DRAWINGS PRIOR TO SCHEDULING ANOTHER INSPECTION ON THIS SITE. ONLY ONE LOT HAS BEEN DEVELOPED AT THIS TIME, 228 S VOZACK LANE. IT APPEARS THAT ADDITIONAL RETAINING WALLS HAVE BEEN ADDED TO THIS SITE AND OTHERS AND WILL NEED TO BE VERIFIED BY THE ENGINEERING AND ZONING REVIEWERS FOR COMPLIANCE PURPOSES. THE ADDITIONAL RETAINING WALLS HAVE BEEN ADDED ON TOP OF THE EXISTING RETAINING WALLS. WHICH TO ME THIS MEANS THAT THE EXISTING FOOTERS HAVE NOT BEEN CHANGED OR ENLARGED TO COMPENSATE FOR THE EXTRA PRESSURE AND FORCE FROM THE ADDITIONAL MATERIAL IN WHICH IT IS RETAINING. VERIFICATION OF THE PROPER FOOTER SIZE AND DIMENSIONS FOR EACH LOCATION NEEDS TO BE DONE BY THE ENGINEER OF RECORD FOR LOTS 2 - 4. LOT 1 WAS NOT DESIGNED TO HAVE A RETAINING WALL BUT MAY NEED TO BE CONSIDERED IN THE NEW DESIGN CRITERIA. |
|
08/15/2019 | GRADING - FINAL | Not ready for Inspection | I WAS UNABLE TO RETRIEVE THE MESSAGE FROM THE SYSTEM, SO THE SITE INSPECTION WAS DONE WITHOUT OWNER REPRESENTATION. THERE WERE NO PLANS AVAILABLE ON SITE FOR THIS INSPECTION SO THIS WILL BE CHECKED ON 8/16/19 WITH THE FILES IN RECORDS. THE OWNER OF THE SITE WILL BE NOTIFIED THAT THE INSPECTION RESULTS ARE POSTED ON 8/16/19. NONE OF THE WORK HAS BEEN STARTED ON THIS SITE, SO THE COMMENT AT THIS TIME IS TO BUILD THE SITE PER THE APPROVED PLANS. ANY MODIFICATIONS WILL REQUIRE EITHER REVISED DRAWINGS OF T07BU00752, OR THE CHANGES MAY REQUIRE NEW DRAWINGS TO BE SUBMITTED FOR APPROVAL. | |
04/18/2011 | GRADING - FINAL | Continued | MET WITH PAUL MACHADO AND FUTURE BUYERS TO DISCUSS WHAT WOULD BE NEEDED ON THIS SITE TO MAKE IT ACCEPTABLE FOR LOT RELEASES IN THE FUTURE. I HAVE ADVISED: 1) THAT THE CURB AND ROADWAY WIDENING WOULD HAVE TO BE COMPLETED PER THE APPROVED PLANS AND THAT ALL UTILITIES WERE UPTO THE PROPERTY LINES, 2) VERIFICATION THAT THE RETAINING WALL INSPECTIONS WERE COMPLETED AND ACCEPTED, 3) HAVE JOSEPH AND ANDREW LOOK AT THE PREVIOUS NPPO COMMENTS TO VERIFY WHAT WOULD BE NEEDED ON THE SITE IN THE FUTURE SINCE SOME OF THE NURSARY PLANTS HAVE BEEN DESTROYED OR HAVE DIED. THESE ITEMS HAVE TO BE COMPLETED PRIOR TO REQUESTING THE RELEASE OF ANY OF THE LOTS. | |
12/02/2010 | GRADING - FINAL | Correction Required | CONTACTED DARYL WITH LANDMARK TITLE AT 906-7891 AND ADVISED HIM OF MY PREVIOUS FINDINGS. | |
11/18/2010 | GRADING - FINAL | Correction Required | COMPLETE ALL AREAS AS SHOWN ON THE APPROVED PLANS, THIS WILL INCLUDE BUT IS NOT LIMITED TO THE FOLLOING ITEMS: 1) INSTALL THE NEW CURBS AS SHOWN ALONG THE EAST SIDE OF THE PROPERTIES, AND THE ADJACENT AC PAVEMENT. 2) COMPLETE ALL NEW SIDEWALKS AND DRIVEWAYS PER THE APPROVED PLANS. COMPLETE ALL DRAINAGE ITEMS THAT HAVE NOT BEEN CONSTRUCTED AT THIS TIME, AND ENSURE THAT ALL PREVIOUS WORK IS STILL ACCEPTABLE FOR THE FINAL INSPECTION. 4) ENSURE THAT ANY AND ALL CHANGES THAT HAVE BEEN MADE TO THIS SITE ARE REFLECTED IN AN APPROVED SET OF REVISED DRAWINGS. 5) BRING ALL CURRENT PERMITS INTO COMPLIANCE BY PAYING ALL ADDITIONAL FEE'S AS NEEDED AND MAKE SURE THAT ALL ON-GOING PERMITS ARE IN AN ISSUED STATUS SO THAT INSPECTIONS CAN BE PERFORMED AS NEEDED. |