Inspection History Details
Inspection Status: Continued
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T07BU00752
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Continued
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/27/2020 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME FOR THE STORMWATER ASPECT, THIS WILL BE CHECKED AGAIN IN 30 DAYS | |
04/18/2011 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME. ADVISED THE PERSPECTIVE DEVELOPER THAT CONTROLS WOULD HAVE TOBE REPLACED ONCE THEY HAVE GAINED CONTROL OF THE SITE. | |
11/18/2010 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CHANGES IN THE SITE, NO CONCERNS AT THIS TIME. WHEN WORK IS RESTARTED THE ISSUANCE OF A NOI WILL BE REQUIRED FOR THE NEW OWNERS OF THE SITE. | |
04/15/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CHANGE IN SITE | |
02/26/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS AT THIS TIME | |
01/22/2009 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTION NOTICE 10 DAYS NOT DONE-PERFORM MAINTENANCE ON SEDIMENT CONTROLS ON W SIDE OF PROJECT AZPDES NOT NEEDED LESS THAN 1 ACRE-PLZ CONTACT THE INSPECTOR TO PROVIDE UPDATED SWPPP INFORMATION INCLUDING POSTING LOCATION, NEW 2008 AZCON#, INSPECTION LOG, ETC. |
|
01/08/2009 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTION NOTICE 10 DAYS -PERFORM MAINTENANCE ON SEDIMENT CONTROLS ON W SIDE OF PROJECT -PLZ CONTACT THE INSPECTOR TO PROVIDE UPDATED SWPPP INFORMATION INCLUDING POSTING LOCATION, NEW 2008 AZCON#, INSPECTION LOG, ETC. |
|
09/29/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | CONTROLS ON WEST SIDE OF PROJECT NEED MAINTENANCE | |
04/28/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | no new work on site | |
10/31/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | ROADWAY NEEDS TO BE SWEPT | |
09/30/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS FILL STILL BEING ADDED TO SITE |
|
09/04/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | RIP RAP WORK COMPLETE AT WASH LOCATION CONCRETE WASH OUT STILL NOT ON SITE UNCONTAINED CONSTRUCTION DEBRIS |
|
08/22/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTION NOTICE ISSUED 7 DAYS -PLACE CONCRETE WASHOUT (SUBGRADE) AND SIGN -PERFORM MAINTENANCE ON SILT FENCE AT SOUTH END WHERE RIP RAP HAS BEEN STOCKPILED AND AT NORTH END WHERE FENCE IS DOWN. |