| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/15/2013 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME | |
| 10/02/2012 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME. | |
| 02/06/2012 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME. | |
| 01/04/2011 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME. | |
| 07/11/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | RAIN 7/10 NO WORK ON SITE NO STORMWATER CONCERNS |
|
| 04/29/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | INFRASTRUCTURE WORK CONTINUING NO STORMWATER CONCERNS AT THIS TIME |
|
| 03/21/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | ROADWORK BEING DONE AT INTERSECTION ROAD BROOM ON SITE |
|
| 03/07/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | SOME TRACK OUT ON ACCESS ROAD TO PARK (PRIVATE PROP) NO OTHER CONCERNS-INFRASTRUCTURE WORK CONTINUES |
|
| 02/29/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | WET UTILITIES BEING INSTALLED | |
| 02/04/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO NEW WORK ON SITE CONTROLS APPEAR TO BE FUNCTIONING |
|
| 01/17/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO WORK ON SITE CONTROLS STILL IN PLACE |
|
| 12/14/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | CONTROLS IN PLACE NO WORK-SITE TOO WET STILL |
|
| 11/28/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | LUIS HAS INSTALLED SWPPP BOARD VANDALISM IS PROBLEMATIC FOR THIS SITE |
|
| 11/15/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | TALKED TO LUIS-SWPPP NEEDS TO BE POSTED | |
| 11/14/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | TALKED TO LUIS VASQUEZ WITH EAGLE ROCK DIGGUNS AND SONS IS SCHEDULED TO SWEEP AT COB TODAY THIS IS THE LAST DAY OF HAUL WORK |
|
| 11/08/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | HEAVY TRACK OUT EAGLE ROCK HAS A SMALL ROAD BROOM ON SITE FOR SOUTH OF THE INTERSECTION CONTRACTOR TO HIRE SWEEPER FOR GOLF LINKS/PANTANO PW INTERSECTION HAUL WORK SHOULD BE COMPLETE BY 11/14 THE MATERIAL IS BORROW FROM T06BU02506 AZPDES POSTING SHOULD BE UP BY MONDAY |