Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date |
Description |
Inspector |
Results |
Comments |
| 12/15/2009 |
STORMWATER FOLLOW-UP INSP |
|
Approved |
Site stabilized |
| 11/24/2009 |
STORMWATER FOLLOW-UP INSP |
|
Correction Required |
Need to sweep gutter along Executive Dr remove silt and debris. |
| 11/17/2009 |
STORMWATER FOLLOW-UP INSP |
|
Correction Required |
landscaping underway so controls are down, site should be stabilized within the week. |
| 10/22/2009 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
Storm controls need repair along north side of building. |
| 08/06/2009 |
STORMWATER FOLLOW-UP INSP |
|
Correction Required |
Contractor neds to install concrete washout area. |
| 07/22/2009 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
Storm controls need some maintenance, contractor to perform inspection. |