Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/24/2009 | GRADING - FINAL | Approved | All items complete | |
| 04/10/2008 | GRADING - FINAL | Correction Required | Contractor re-surfaced southwest half of parking area. | |
| 09/11/2007 | GRADING - FINAL | Correction Required | Contractor needs to call in final inspection. | |
| 08/02/2007 | GRADING - FINAL | Not Applicable | Contractor needs to call in final inspection. | |
| 06/21/2007 | GRADING - FINAL | Denied | Contractor needs to: 1- Update all HC ramps to new standards. Per J. Sanders. 2- Install bollards in trash enclosure. 3- Stabilize all areas disturbed by construction. 4- Provide drainage to street on southwest corner. 5- Install rip rap at northside of valley gutter. 6- Fill in all open holes around site. |